Injection Cap Structural Foam Mold Molding Insert Mould Moulding Maker plastic mold injection injection
1.Sample/Drawing | We make drawing according to samples or you provide drawings. |
2.Negotiation | Quality grand, Material, Cavity, Delivery time, Payment term, etc. |
3.Order confirmed | According your own drawing or our design with samples. |
4.Mould | According to customer’s request to make the mould. |
5.Sample confirmation | Provide sample photos to you, also send samples by DHL if necessary, if not satisfied, we modify mould. |
6.Package&Delivery | Will make export package and arrange shipment as your request. |
A: We are factory.
A: Generally it is 3-5 days if the goods are in stock. or it is 3-5 days if the goods are not in stock, it is according to quantity.
A: No, we produce single product sometimes, that's why we don't offer samples.
A: Full Payment, balance before shippment.
If you have another question, pls feel free to contact us as below
Q:How long do you need for making my parts?
A: We have always been dedicated to providing our clients with a rapid prototyping service.As usual,3-5 days is OK.
It will mainly depends on the quantity you need and processing way you prefer.
Q:How will you ship the prototype to me?
A,: We will make a best plan to ship the prototype as per its size and material.We generally use DHL/FEDEX/UPS/EMS.
WHY CHOOSE US?
1. One Stop Service
We can offer part design, model building, rapid prototype testing and injection molding mass production services.A range of surface finishing, post-processing and assembly are also workable. Can bring you a convenient and efficient experience.
2. Non Disclosure Agreement
We can sign NDA with you and keep secret to your idea and design.
3. Professional Engineering Team
We have a professional engineering team, half of whom have more than 15 years of experience in the mold industry, especially tooling, pleastic molding products, CNC machining and 3D printing.
4. Fast Delivery Time
We have advanced technology processing machines and time-mobilized staffs, so can finish prototype project within 3-5 days, prototype mold within 15 days, and 3-5 weeks to make mass production complex mold.
5. Quality Control Expert
We have passed ISO9001 Quality Management System Certification, having onsite materials, toolings and parts inspection before production and delivery.
6. Experienced Business Development Team
We have 15 business development specialists with good English capabilities and communication skills to know your need timely.
Welcome to get a quote!