Replace The Underground Pipeline With New Pipeline System
Underground old pipeline replacement system BX40
Description
The pipeline replacement system independently developed by our company is mainly used for the replacement of urban underground pipelines. After some old pipelines are damaged, they can be replaced with new ones through our equipment. The old pipes can be made of cement pipes, steel pipes, PE pipes, etc. Generally, the same pipe diameter replacement or reduced diameter replacement is supported
Project | Unit | BL25 | BL40 | BL90 | KX80 |
Load | KN | 250 | 400 | 900 | 800 |
Full thrust | KN | 140 | 220 | 480 | *** |
Maximum pull-back speed | m/min | 2.6 | 2.9 | 2 | 1.5 |
Minimum pull-back speed | m/min | 1.4 | 1.6 | 1.1 | 0.8 |
Advance rate | m/min | 2.6 | 2.9 | 2 | *** |
Power | KW | 4 | 7.5 | 11 | 7.5 |
Size of the host (length width and height) | mm*mm*mm | 680*460*370 | 770*575*406 | 1140*855*592 | 600*400*400 |
Hydraulic station size (length width and height) | mm*mm*mm | 800*550*500 | 1200*1000*900 | 1350*1100*1000 | 1200*1000*900 |
The host weight | kg | 145 | 260 | 800 | 280 |
Hydraulic station weight | kg | 200 | 400 | 600 | 400 |
Fit diameter of manhole | mm | 520 | 630 | 1000 | 420 |
Require well dimensions (length) | mm | 1000 | 1200 | 2300 | 420 |
Rod specifications | mm*mm | Φ42*600 | Φ60*600 | Φ68*1000 | Φ68*600 |
Project | Unit | KX80 | KX50 | BX40 |
Load | KN | 800 | 50 | 40 |
Full thrust | KN | |||
Maximum pull-back speed | m/min | 1.5 | 1.5 | 1.8 |
Minimum pull-back speed | m/min | 0.8 | 0.8 | 0.9 |
Advance rate | m/min | 1.8 | ||
Power | KW | 7.5 | 4 | 4 |
Size of the host (length width and height) | mm*mm*mm | 600*400*400 | 480*400*400 | 413*452*311 |
Hydraulic station size (length width and height) | mm*mm*mm | 1200*1000*900 | 800*550*500 | 800*550*500 |
The host weight | kg | 280 | 120 | 120 |
Hydraulic station weight | kg | 400 | 140 | 200 |
Fit diameter of manhole | mm | 420 | 420 | 460 |
Require well dimensions (length) | mm | 1000 | 800 | 800 |
Rod specifications | mm*mm | Φ68*600 | Φ60*500 | Φ6*500 |
Our Services
1. Drill pipe strictly according to API ISO9001 standard
2. If you found to quality problems within one month of the package returned.
3. All strictly according to the contract and fulfill the obligations and responsibilities
4. 24 hours online customer service,feel free contact us.
FAQ
Q: What's your delivery time?
A: Commonly produce need 20 days to produce. Within 3 days if in stock.
Q: How to control the quality?
A: We should be checking & testing everyone drill rod before shipment.
Q: Do you agree sample order?
A: Yes, we are welcome your sample order to testing our quality.
Q: Does your drill rod have heat treatment?
A: Yes, the heat treatment for our drill rods and casing pipes.
Q: Does your drill rod have rust prevention?
A: Yes, every one drill rod and casing pipe will be with the rust prevention by paint or anticorrosive oil before shipping. If you need galvanized pipes pls contact us the price.