6m reverse circulation (RC) drill pipe for reverse circulation drilling
Product Description
This series of reverse circulation pipes can increase the permeability of the lost stratum, reduce the consumption of drilling fluid, protect the reservoir stratum, and save the cost of other consumable tools. In addition, the pipeline can be drilled in two directions to control the drilling. The reverse circulation kill method can transfer heavy mud directly to the bottom of the well without periodic circulation, saving time.
Working principle
The working principle of gas lift reverse circulation is similar to that of an air compressor, that is, compressed air is sprayed into the inner tube from the mixer through the double-wall movable drill pipe, the inner wall of the outer wall pipe and the outer pipe ring gap through the double-wall gas faucet or air box, forming Numerous small bubbles rise rapidly along the inner tube and expand at the same time, thereby generating air lift. As the compressed air continuously enters the well fluid, a low-density gas-water mixture is formed in the upper part of the mixer, and the fluid ratio in the well is large. According to the principle of the connecting device, the gas-water mixture in the inner tube flows upward under the action of the pressure difference and flows into the well. The cores or cuttings at the bottom are continuously discharged from the surface and into the sedimentation tank. The sedimented mud flows back into the hole and enters the circulating fluid space in the drill pipe through the bottom of the hole.
Double wall drill pipe
Type | O.D.of the outer tube (mm) | I.D.of the inner tube (mm) | Outer dianeter of joint (mm) | Type of threads | Effective length (m) |
WB114/65 | 114 | 65 | 156 | 41F | 6 |
WB127/76 | 127 | 76 | 162/168 | 41/21F | 6 , 9.5 |
DB127/76 | 127 | 76 | 184 | 51/2FH | 9.5 |
WB140/88 | 139.7 | 88 | 184 | 51/2FH | 6,9.5 |
WB219/130 | 219 | 130 | 240 | Factory standard | 6,9.5 |
WK76/32 | 76 | 32 | 78 | 3" Remet | 3 |
WK102/41 | 102 | 41 | 103 | 4" Remet | 3 , 6 |
WK114/52 | 114.3 | 52 | 116 | 4 1/2" Remet | 3 , 6 |
WK114/38 | 114.3 | 38 | 114.3 | 4 1/2" Metzke | 3 , 6 |
WK114/50 | 114.3 | 50 | 114.3 | 4 1/2" Remet | 3 , 6 |
WP50/20 | 50 | 20 | 50 | 1 , 1.5 | |
WP73/35 | 73 | 35 | 73 | 1 , 1.5 | |
WP89/40 | 89 | 40 | 89 | 1 , 1.5 |
Our Services:
1. Drill pipe strictly according to API ISO9001 standard.
2. If you found to quality problems within one month of the package returned.
3. All strictly according to the contract and fulfill the obligations and responsibilities.
4. 24 hours online customer service,feel free contact us.
FAQ
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 7-30 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
Q: Do you provide samples ? is it free or extra ?
A: Yes, we could offer the sample need to pay the cost of products and freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.