Efficient pumping capacity: The theoretical concrete displacement can reach up to 120 cubic meters per hour at low pressure and 70 cubic meters per hour at high pressure. It can quickly complete the concrete transportation work and improve construction efficiency. Outstanding pumping pressure: The theoretical pumping pressure is 8 MPa at low pressure and 13 MPa at high pressure. The strong pumping pressure enables it to transport concrete to a higher height and a longer distance, meeting the needs of different construction scenarios. Good material suction performance: Equipped with a pumping system with a large cylinder diameter (Φ230mm) and large displacement. The material suction rate is over 85%. With low reversing times at the same displacement, the service life of wearing parts is long.