Food Processing Light CO-HALO-F80W
Food Processing Led High Bay Lights High Pressure 80W 160lm/w 60 90 120 Degree
Product Name | CO-HALO-F |
Wattage | 80W |
Driver | Meanwell |
Lamp Efficiency | 160LM/W±5% |
Light Source | Lumileds |
CRI | Ra>70/80 |
CCT | 2700-6500K |
Rated Voltage | AC 100-240V 277V~,50/60Hz |
Power Factor | >0.95 |
Beam Angle | 60°/90°/120° |
IP Grade | IP69K |
Operating Temp | -40℃~55℃ |
Weight | 3.6kg±5% |
Size | φ380*63mm |
Why choose us?
1.Your inquiry about the product or price, we will reply within 24 hours as much as possible.
2.Well-trained and experienced staffs to answer all your enquires in fluent English.
3.Any your customized lightings we can help you to design and put into product.
4.Distributorship are offered for your unique design and some our current models.
5.Protection of your sales area, ideas of design and all your private information.
Q: 1. Can I have a sample order for led light?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q: 2. What about the lead time?
A:Sample needs 3-5 days,batch production time takes 7-15 working days.
Q: 3. Do you have any MOQ limit for led light order?
A: No MOQ.
Q: 4. How to proceed an order for led light?
A: Please contact me if you are interested in our LED light, Send inquiry to me or talk with me online.Then I can quote you according to your requirement.
Q: 5. Can I print my logo on led light products?
A: Yes, we will customize according to the artwork and requirements you provide.
We Ship to Worldwide, except APO/FPO.
Items are shipped from China using Airmail, reach most of the countries within 10 to 20 business days.
Delivery time depends on destination and other factors, it may takes up to 20 business days.
• All items will be shipped within 2 business days after the payment is cleared.
• All items will be shipped via Post Mail, which normally takes 15-35 days to arrive.
• International shipping requires more complicated shipping procedures (such as both countries customs, transit stations etc.), also will effect by many factors, such as holidays, weather conditions etc, so it will probably take longer time for your items to arrive at the final destination. Thank you for your understanding on this matter.
• Import duties, value added taxes and any other charges are not included in the item price or shipping costs.
Country Delivery Time(Via Post Airmail),Working Days + Saturday + Sunday
North American /West Europe | 7~20 days |
Eastern Europe | 7~35 days |
Australia | 7~30 days |
Central Asia | 15~45 days |
South American | 15~50 days |
Eastern Asian | 7~20 days |
Others | 15~60 days |
Facebook: https://www.facebook.com/COMING.Lighting
Linkedin: https://www.linkedin.com/company/shenzhen-coming-technology-co-ltd
Twitter:https://twitter.com/LED_GCOMIN
INS: https://www.instagram.com/coming_lighting