S136 1.2311 LKM Plastic Mold Design Injection Canister Mirror Face
S136, 1.2311 LKM standard Precision Plastic Injection Canister Mirror Face Mould
JDmoulding Cooperation Model
Customer rises/ideas issues----Analyze ideas/issues----Offer solution/drawing----Customer Confirmation
----Mold Making----Trial Production and Review----Mold Mass Production----The Final Product Assembly
Name: | Mould |
Plastic Material Type: | ABS, ABS+PC, PP, PS, POM, PVC, TPE, TPU, PA66,PA6,PA66+30CF,etc. |
Mould Steel: | Assab, AISI & JIS, DAIDO STEEL, Formadur, Gröditz GmbH, ALCOA,S136, 1.2311, 1.2738, NAK80, 2344, 420, 2083 |
Mold Base: | HASCO standard, DME standard, LKM standard, PUNCH, JINHONG, Other |
Cavity No: | Single, Multi Cavity, Change Insert |
Surface Treatment: | Zinc plating,nickel plating, chromium plating,brass plating,decromet, etc. |
Mould Texture: | EDM,VDI 3400 Code ,MOLD-TECH, Texturing,Cavity ,Core Finishing,High Polish, mirror face, Grade 3 Diamond, Paper Finish, Stone Finish. |
Type of Gate: | Cold Runner, Hot Runner, Sprue Gate, Edge Gate, Pin Point Gate, Sub Gate |
Type of Ejection: | Pin, Ejector Blade, Stripper, Ejector late, Ejector Sleeve, Lifter, Pneumatic Ejector. |
Jdmoulding Injection Parameter Datasheet
Mould Name | Canister mould | Part Name | Auto parts | No.of cavities | |||||
Part Material | ABS+PC | Color | Black | Sample request | |||||
Injection Machine | 200 Tons | Test Time | 3nd Time | Date | |||||
ST | 1 | 2 | 3 | 4 | 5 | Cooling Time(sec) | 0 | ||
Barrel&Nozzle Temp | 240 | 235 | 225 | 210 | 180 | Recovery Time(sec) | |||
Clamp Open End Position | Mould Temperature | ||||||||
Injection | 1st | 2nd | 3rd | 4th | Hold | 1st | |||
Injection Pressure(bar) | 110 | 55 | Hold Pressure(bar) | 75 | |||||
Injection Speed(mm/s) | 55 | 12 | Hold Speed(mm/s) | 25 | |||||
Injection Position(mm) | 32 | Time(sec) | 7 | ||||||
Ejector | Ejector Forwarder | Ejector Retract | Storage | 1st | |||||
1st | 2nd | ||||||||
Pressure(bar) | 65 | 55 | 45 | Pressure(bar) | 85 | ||||
Speed(mm/s) | 25 | 20 | 60 | Speed(mm/s) | 75 | ||||
Delay(sec) | Delay(sec) | ||||||||
Position(mm) | 50 | 60 | Position(mm) | 35 | |||||
Ejector Method | Hold setting times | Back Pressure |
Process For Project Management