PLC Control Automatic metal steel roller shutter door frame roll forming machine
The line consists of decoiler, sheet guiding equipment, roll forming section, cutter, supporter, hydraulic system, control system. The roller shutter which made by this machine have neat external appearance, even ripples, high utilization and strong strength.
Production Process of Shutter Door Roll Forming Machine :
Uncoiling→ Feeding material into machine →Roll forming → Auto cutting →Products receiving
Technical parameters of Shutter Door Roll Forming Machine :
Suitable Material | Material | Galvanized Sheet |
Thickness | 0.3-1.2 mm | |
Material of rollers | High grade 45# forged steel, surface hard chromium plating | |
Rows of rollers | 12 stations | |
Material of shafts | High grade 45# forged steel | |
Diameter of shafts | 50mm | |
Material of blade | Cr12 Heat Treatment | |
Speed | 15-20 m/min | |
Side plate thickness | 16 mm | |
Total power | 4 kw | |
Voltage | 380V 50HZ 3Phase | |
Appearance size (About) | 4500mm*800mm*1500mm | |
Electronic control system | PLC +Touch Screen |
Standard Configuration of Shutter Door Roll Forming Machine :
1 ton Manual decoiler | 1 set |
Main roll forming machine | 1 set |
Hydraulic pump system | 1 set |
PLC control system | 1 set |
Receiving Table | 1 set |
Spare parts | 1 set |
Packing Method
Main machine is packaged with plastic film
Transportation
All machines need one 20 feet container to hold
Payment Term
30% deposit by T/T in advance and 70% balance after inspection confirmation before shipment.
Delivery Time
Within 35 days after receiving deposit.
Warranty
Two years, and we will provide technical support for wholelife of the equipment.
If some parts of machine broken within 2 year, we will give customer the spare parts for free. (include chain, bearing, roller,oil pipe, counting wheel) If more than 2 year, maybe some spare parts need to be charged. If machine can not work well, we can teach them online until the machine is perfect. If you need, we can go to your place to assist you. But you need to provide the cost of the engineer.