Floor deck panel roll forming machine 16 rolling steps 8 - 12m / min
Our machine has high grade quality and reasonable price.It also has high efficiency. We have good reputation all over the world. They are welcomed by customers around the world, And our company can customize special type,the quality can be guaranteed because we provide free after-sale service.
Machine information:
No. | Main parameter for floor deck panel roll forming machine | |
1 | Suitable to process | Galvanized/Aluminum/Color steel sheet |
2 | Width of plate | 1250mm |
3 | Thickness of plate | 0.3-0.8mm |
4 | Rollers | High grade 45# steel, with hard chrome plating |
5 | Forming steps | 16 |
6 | Sprocket chain | 1.5 inch |
7 | Pump station power | 4kw |
8 | Shaft | 75mm, high grade 45# steel, heat treatment |
9 | Hydraulic oil pump | CB-E310 |
10 | Weight | About 5.0 tons |
11 | Productivity | 8-12m/min |
12 | Cutting head | Cr12 mould steel with quenched treatment |
13 | Control system | TAIDA brand PLC control |
14 | Voltage | 380V 3Phase 60Hz |
15 | Motor power | 4kw |
16 | Dimension | About 6.8m*1.5m*1.5m |
17 | Hydraulic pressure | 10-12mpa |
18 | Index error of length | ±1mm |
19 | The temperature range of working line | -35-50° |
Rollers are high grade 45# steel with hard chrome plating
Shaft material: high grade 45# steel, 75mm diemeter with heat treatment
Working speed can reach 8-12m/min
Control system : Taida brand PLC control
Other details:
1 .Color:Blue, We can make and design as customer's requiement.
2 .Control System:PLC Computer
3 .Effective Width:840/900mm
4 .Coil Width:1250mm
5 .Sheet Thickness:0.3-0.8mm
6 .Pump Power:3kw
7 .Main Moter Power:5.5kw
8 .Middle Plate:14mm
9 .Chain:1 Inch
Service Commitment & Quality Assurance:
Installation: If necessary, engineer is available to service machinery
overseas; but all the relevant cost and extra 100USD/day for our
engineer will be paid by the buyer.
Warranty: 1 year since the machine leave seller's factory.
During the warranty period, it covers all spare parts of machines, if
you find some spare parts were damaged, those new spare parts will be
supplied free by us, but normal wear and tear excepted. And the
freight should be bore equally by both parties.