Composite Metal Floor Deck Roll Forming Machine 12m / min Capacity
Our products Composite Metal Floor Deck Roll Forming Machine are widely used in various fields: industrial factory, civilian building, warehouse, easy steel building, manufacturing, construction and have features such as nice appearance and durable.
Machine Specification:
Special requirement pls feel free to contact us
Material Spec | colored steel sheet, galvanized steel sheet |
Input width | 914,1000,1200,1250mm or others |
Effective width | according to final drawing |
Roller station | as your profile |
Coil Thickness | 0.8-1.2 mm |
Forming speed | 10-15m/min |
Main motor power | 4kw |
Hydraulic power | 4kw |
Roller material | high grade No.45 forged steel, with 0.05mm plated coating |
Shaft material | 45# high grade steel,diameter 75mm |
PLC | Delta brand |
De-coiler—→Level device —→Main roll forming machine—→Hydraulic cutting—→ Run out table
Descrption of some parts lines
Hydraulic Un-coiler
Width of raw material: 1250mm Max Capacity: 10ton
Max out diameter of coil: 1800mm Inner diameter of coil: 500-600mm Hydraulic feed and brake
Shearing Device
Blade and mold material:GCR12steel with quenched treated 60-62ºC. It can decide cut panel dimension according to the hydraulic drive and PLC computer control system.
Main Forming System
Special requirement pls feel free to contact us
Electrical System
PLC and HMI touch Screen
Automatic length measurement
Automatic quantity measurement
Over current protection for control system, aviation plugs
Cutting off type: Paused to cut, moving automatically after cutting.
Power: 380V 60Hz
Drawings of Floor Deck,welcome to send us your design
Our Service | |
1 | One-year quality assurance for all the machine |
2 | Technical staff available to service machine overseas |
3 | Permanent free for technical support |
4 | Design and produce according to your sample or drawing |
Packing:
1 . one 40ft container for loading one set machine with manual uncoiler;
2 . the whole Wiped Anti Rust Oil, PLC controller covered by foam film;
3 . Spare parts and some small parts packed in plastic tooling box;
4 . All components fixed by steel wire with container. Or as clients' request
Delivery Time: Within 45- 60 days after receipt of buyer's deposit