Material Thickness 0.3-0.6mm Fully Automatic r Downpipe Roll Forming Machine
Downpipe roll forming machine description
This downpipe roll forming machine is for steel sheet or aluminum sheet cold-form industries. It can roll-forming the steel sheet according to the customer’s requirement continuously, automatically cut to length. The equipment adopts PLC control, AC frequency and adjusting the speed technology, and it realizes the continuous automatically production, therefore, it is really a new type of energy-saving and high-effective producing equipment for the metal downpipe.
Our downpipe roll forming machine has many advantages, just like high forming speed, low noise, stable transmission, easy operation, good appearance and so on.
Working Flow of Square Pipe
De-coiler—→Level device —→Main roll forming machine—→Hydraulic cutting—→ Run out table
Technical Parameter
Item NO | Description |
Rolling speed | 5-12m/min(not include cutting time) |
Rolling thickness | 0.3-0.6mm |
Raw material | Galvanized steel sheet |
dimension | 3500×1600×1500(mm) |
Roller stations | 20 stations |
Roller material | 45#forge steel, coated with chrome |
Main axis dia | Φ70mm ,material is 45# forge steel |
Transmission | By chain 1 inch |
Material of chain | 45# forged steel with frequency quenching, 12A |
Material of cutting | Cr12Mov with quench HRC58-62° |
Tolerance | 6m+-1.5mm |
Frame | H type steel |
Machine Components
The Whole downpipe roll forming line comprised of 3T manual uncoiler, main drive, infeed guiding, roll forming machine, straighten device, cutting equipment, hydraulic system, electrical controlling system, out put table. Elbow machine and the seaming machine
Advantage
1. Reasonable Price
2. High Quality
3. 12 Months Warranty
4. More Than 20 Years Experience
5. Durable
6. Reliable
Profiles of Square Pipe
Warranty
1: Guaranteed against malfunctions due to manufacturing defects for 1 year after the date of shipment. Repairs will be made free of charge.
2: Repairs will not be performed free of change even during the guarantee period in the following circumstances
- Damage occurs due to a natural disaster
- A malfunction occurs due to user error
- A malfunction occurs due to modifications
- A malfunction occurs due to further movement or shipment after installation
3: Air ticket, transportation cost, hotel, meals and 100$ per day shall be for purchaser’s account if the manufacturer’s engineer has to be send to the purchaser’s factory to maintain the machine during the guarantee period.