CE / ISO9001 2.5 m high-speed double shaft needle punching machine
How do we pack the machines?
Packing before shipment is a considerable effort for us where we always care for the safety of the machines.
1. Draw machine packing chart before loading the machine.
2. Segregate the machines to load them with ease after the successful trial and testing of the machine.
3. Wrap the machines with felts and wound films to ensure the safety of the machines and avoid any breakage due to jolting of the vehicles. ( Truck or Ship)
4. Spare parts are kept in the wooden case to avoid breakage.
5. Note the details of the machines after loading in each containers and make the descriptive details of containers which is then forwarded to customers for their reference.
Structure
Needle Punching Machine |
Working Width:1500-8800mm |
Needling Frequency:800-1600t/min |
Needle Stroke:30-60mm |
Stroke type: Up-stroke; Down-stroke |
Needle density:2000~8000n/m |
Functionality & application: |
1.By means of the needle punching process, the fiber will be entangled to create the cohesive force that makes the fiber web to be bonded. |
2. Applicable for making a variety of nonwovens: carpet, felt, interlining, geotextile, filtration media etc. |
Features: |
1. Automated and frequency conversion controlled |
2. Advanced combined structure enables the excellent stabilization |
3. Computerized random distribution of needles |
4. Separated lubrication system with air cooling |
5. Easy operation and convenient maintenance |
Characteristics:
Trade term | EXW, FOB, CFR |
Lead time | 90 days |
HS code | 84490090 |
Payment term | 30% deposit, 70% paid off before loading |
Warranty | 12 months |
After sale service | The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD200/Day/engineer and totally installation period is about 30-35 days depending on well cooperation of the buyer. |