ISO9001 9m Middle Speed Nonwoven Automatic Needle Punching Machine For Cotton
The performance of the whole production line for quilt
1) the speed governing system can be controlled by the speed control of the infinitely variable speed motor or the speedregulation by frequency converter.
2) the raw material can be used as chemical fiber, wool, hollow and so on.
3) electrical components use brand-name electrical appliances, light control switch adopts imported brand.
4) The total area of the machine is 11 meters -12 meters long and about 13 meters long.
5) The total power of the motor is 18kw-25kw.
6) The total weight of the whole machine is between 10 tons and -20 tons.
Structure
Needle Punching Machine/Needle Loom |
Working Width:1500-8800mm |
Needling Frequency:800-1600t/min |
Needle Stroke:30-60mm |
Stroke type: Up-stroke; Down-stroke |
Needle density:2000~8000n/m |
Functionality & application: |
1.By means of the needle punching process, the fiber will be entangled to create the cohesive force that makes the fiber web to be bonded. |
2. Applicable for making a variety of nonwovens: carpet, felt, interlining, geotextile, filtration media etc. |
Features: |
1. Automated and frequency conversion controlled |
2. Advanced combined structure enables the excellent stabilization |
3. Computerized random distribution of needles |
4. Separated lubrication system with air cooling |
5. Easy operation and convenient maintenance |
Characteristics:
Trade term | EXW, FOB, CFR |
Lead time | 90 days |
HS code | 84490090 |
Payment term | 30% deposit, 70% paid off before loading |
Warranty | 12 months |
After sale service | The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition the buyers should assign translator, workers, electrical cable (from machines to control panel and from power to control panel) and tools for installation to cooperate with the work. Installation cost is USD200/Day/engineer and totally installation period is about 30-35 days depending on well cooperation of the buyer. |