Thermal Bonding Polyester Nonwoven Machine Mattress Oven Wadding Nonwoven Machine polyester fiber roller machine
A percentage of polyester staple fiber ,hollow staple polyester(or natural wool fiber) and low melting point fibers be opened and blended by opener, then carded and lapped with required thickness, and set by the process of drying and setting.
Products feature: good permeability, good warmth retention property, lightweight sound absorbing, high resilience, aging resistance, washable, clean with no harmful substances.
Products Application: The product is widely applied to industry filter materials, sound absorbing materials and bedding's, clothing materials, tourism supplies; mattress and sofa cushion cotton for civil uses.
Raw Material ratio: Usually low melting point fiber 4Dx51mm 15%-25%, hollow polyester staple 6DX51-65mm 40-50%(optional), Polyester fiber 6DX51-65mm 30-40%
It utilizes a servo motor and servo controller system or inverter with web storage and profiling function to keep the web thickness uniformly
Servo motor central controlling system and PLC touch screen interface. this provides high-quality web controlled by computer to ensure quality as well as speed
Raw material |
polyester fiber, waste fiber, low melt fiber, etc. |
Trim width |
2500mm |
Weight range |
400g/m2-4000g/m2 |
Production capacity |
1000kg/h |
Trade term |
FOB Shanghai |
Payment term |
30% T/T advance, 70% paid off before delivery. |
technical parameter
Trade terms
|
EXW, FOB, CIF
|
Leading time
|
90 days
|
HS code
|
84490090
|
Payment terms
|
30% deposit, 70% paid off before loading.
|
Warranty
|
12 months
|
After-sale service
|
The seller is responsible for installation and debugging. The buyer is responsible for the round-trip airplane tickets, accommodation, medical treatment, safety and relative fees. In addition, the buyers should assign a translator, workers, electrical cable (from machines to control panel and from power to control panel), and tools for installation to cooperate with the work.
Installation cost is USD200/Day/engineer and totally installation period is about 30-35 days depending on well cooperation of the buyer. |