Unique Challenges? We’ve Got the Precision CNC Solution Just for You!
Df Wholesale Price High Demand CNC Mechanical Accessories For Micro Grinding
| CNC machining ,CNC turning, CNC milling, Drilling, Grinding, Wire-EDM cutting , Plastic Injection,Stamping,Die Casting,Silicone And Rubber,Aluminum Extrusion |
Surface Finish | Anodizing,Sand blasting,Painting,Powder coating,Plating,Silk Printing,Brushing,Polishing,Laser Engraving |
| ISO9001:2015, ISO13485:2016, SGS, RoHs, TUV |
Tolerance | +/-0.002~+/-0.005mm |
Lead Time | 1-2 weeks for samples, 3-4 weeks for mass production |
File Formats | PDF, CAD, DWG, STEP. etc |
Application | Aerospace, Electric Vehicles, Firearms, Hydraulics and Fluid Power, Medical and Dental, Oil and Gas, and many other demanding industries. |
Tolerance:+/- 0.01mm
Special Areas : +/-0.005mm
Surface Roughness: Ra 0.1~3.2
QC:100% Tested MOQ:1-Piece minimum order
Tolerance:+/- 0.01mm
Special Areas : +/-0.005mm
Surface Roughness: Ra 0.1~3.2
QC:100% TestedMOQ:1-Piece minimum order
Tolerance:+/- 0.01mm
Special Areas : +/-0.005mm
Surface Roughness: Ra 0.1~3.2
QC:100% Tested MOQ:1-Piece minimum order
Material:
Aluminum Alloy,Zinc Alloy M0Q:more than 1000
Tolerance:+/- 0.01mm
Special Areas : +/-0.005mm
Surface Roughness: Ra 0.1~3.2
QC:100% Tested MOQ:1-Piece minimum order
Friction welding machines
Welding of different products together by high-speed friction

Welcome to know more about us
1.2500 square meters factory mainly provides CNC machining service
2.ISO certificated,supports third-party verification.
3.5-axis CNC Machining
4.13-years experience in precision metal machining
5.Engineering service provided.
FAQ:
1. How to get a quote?
Detailed drawings (PDF/STEP/IGS/DWG...), including quality, delivery date, materials, quality, quantity, surface treatment and other information.
2. Can I get a quotation without drawings?
Can your engineering team draw for my creativity? Of course, we are also glad to receive your samples, pictures or detailed size drafts for accurate quotation.
3. Can you provide samples before mass production?
Of course, the sample fee is necessary. If possible, it will be returned during mass production.
4. What is the delivery date?
Generally, the sample lasts for 1-2 weeks and the batch production lasts for 2-3 weeks.