High-performance 160TPH Stationary Asphalt Mixing Plant
Main advantages of 120t/h asphalt batch mix plant:
• Cost effective solutions for your project
• Multi-fuel burner for choose
• Environmental protection, energy saving, safe and easy to operate
• Low maintenance operation & Low energy consumption & Low emission
• Optional environmental design - sheeting and clad to customers requirements
• Rational layout, simple foundation, easy to be installed and maintenance
Technical parameters of 120tph batch asphalt mixing plant
Model | ZAP-S120 |
Rated capacity(T/H) | 120 |
Total power(kW) | ≈500 |
Mixer volume(kg) | 2000 |
Cold aggregtae kinds | 5 |
Vibration screen | Uniaxial circular vibrating screen |
Mixing cycle | 45S |
Fuel consumption | ≤6.5kg/t finished product |
Fuel type | Heavy/ Light oil |
Control mode | Manual/ Automatic |
Finished product temperature | 140-180°C |
Aggregate weighting precision | ±0.5%(Dynamic) |
Mineral weighting precision | ±0.5%(Dynamic) |
Bitumen weighting precision | ±0.25%(Dynamic) |
Dust control way | Primary cyclone dust collection , secondary bag dust collection |
Exhaust emission concetration | ≤20mg/Nm3 |
Finished product bin | Bottom placed / side placed |
Optional |
Asphalt Plant capacity is base on standard working condition as followings:
Atmospheric pressure | 760mmHg |
Ambient temperature | 20℃ |
Material passing 40mm mesh | 100% |
Material passing 3mm mesh | 40% |
Material passing 74µm | ≤7% |
Aggregate temperature at discharging end of drum dryer | 160℃ |
Density of aggregate | 1650kg/m3 |
Specific heat of aggregate | 0.21kcal/kg℃ |
Filler content | 5% |
Bitumen content | 5% |
Sand content | ≤40% |
Max.aggregate size | ≤40mm |
Average moisture of cold aggregates | ≤5% |
Cycle time per batch | 45s |
Diesel calorific value | ≥10500Kcal/kg |
Heavy oil calorific value | ≥9850Kcal/kg |
Nature gas calorific value | ≥8000Kcal/Nm3 |
Coal calorific value | ≥5500Kcal/kg |
FAQ
Q1: Are you trading Company or Factory?
We are factory. We have been engaged in the production of asphalt machine for more than 30 years.
Q2: How to use this asphalt mixing plant?
As a professional asphalt mixing plant manufacturer,we have many professional engineers, they will go to clients' site for guiding the installation and test-running;also can teach you how to use the mixing plant properly.
Q3: Can you sent me some spare parts freely?
Generally speaking,we usually sent customers the wearing parts when shipping the product, but if you have a large order,we will consider to sent you some spare parts freely
Q4: What is the delivery time?
Usually can deliver within 35-40 work days
Q5: What is your payment method?
A: 30% of total price should be paid by T/T as down payment; 70% balance payment should be paid by T/T before delivery. We also support L/C, Western Union
Q6: Do you provide after-sale service?
Yes. The warranty period of our machines is one year, and we have a professional after-sale service team to promptly and thoroughly solve your problems.