Automatic Machine Blowing Machine 30000L 7 Layers Plastic Injection
PRODUCT DETAILS
12'Siemens touch screen+World advanced MOOGparison thickness control system.
Integral electric cabinet, equipped with air conditioner,can adapt to abnormal weather working environment.
Siemens remote control system,Equipped withSchneider soft starter.
Siemens remote control system,Equipped withSchneider soft starter.
The screw adopts cast aluminum heating ring forheat conduction effect, and the independent coolingfan hood is closed quickly to control the temperaturedeviation.
Lubricating pump, cleaning guide rail, smooth operation.
Huayu patented three-cylinder rapid opening andclosing mold locking system.
Q&A:
Q2: what is the warranty period of your machine?
Answer: The free charge guarantee term is 12 months after the installation and adjustment in your factory.
Q3: what if my machine damaged doing the warranty period?
Answer: firstly, our engineer will help you to diagnose the problem via online guidance. if any parts damaged during the warranty period, we will send the parts to you for replacement free of charge. If you can not fix he problem by replacement of the new parts, we will send engineer to your factory to help fixing the machine.
Q4: what is the delivery time of your machine?
Answer: Normally it would take about 90-120 days to complete the machine.The specific time needs to be based on your machine.
Q5: can you provide us the machine drawings and technical proposal?
Answer: yes. After receiving your detailed requirement and product drawings, our engineer will come out with the suitable
technical proposal with the basic machine concept drawings to you. Be size after you placing the order we will send you the more detailed technical configuration of the machine to you for confirmation. Only after you confirming the technical configuration then we will start the manufacturing process.
Q6: what’s your payment terms?
Answer: we can accept the following payment terms: T/T, L/C, Alibaba .
Q7: how can we install the machine?
Answer: you provides the invitation letter for visa applying once the machine to be shipment. We’ll dispatches one engineer and one English interpreter to your factory once the machine arrive your factory or as the your request.