2T Double Cage/Cabin SC200 Building Hoist Construction Elevator
Services for 2T Double Cage/Cabin SC200 Building Hoist Construction Elevator
1. Installation, debugging, operators trainning;
2. Maintanence:
A. when trainning your operators, our engineers will give them advice on how to operate the machines correctly;
B. we will send you the operation manual which can help you operate the machins properly, it can also help you to solve the common problems;
C. Call us at any time if you have problems about our tower crane;
D. If needed, we will send engineers to your site to solve your problems.
3. Providing some documents for your customs clearance, like commercial invoice, packing list, certificate of origin etc;
4. Spare parts supply.
5. More products for you to choose
Specifications for 2T Double Cage/Cabin SC200 Building Hoist Construction Elevator
Rated Load | 2000kg |
Rtated Passengers | 20 |
Rated Lifting Speed | 34.4m/min |
Motor Power | 3*11kw |
Motor Breaking Torque | 120N.M |
Overrun Protection Device breaking Speed | 51-56m/min |
Overrun Protection Device Rated Breaking Load | 30KN |
Max.Lifting Height | 150-200m |
Cage Size(L*W*H) | 3.0*1.3*2.3m |
Mast Section Size(L*W*H) | 0.65*0.65*1.508/0.80*1.80*1.508m |
Mast Weight | 158/172kg |
Rated Erection Load | 200kg |
FAQ for 2T Double Cage/Cabin SC200 Building Hoist Construction Elevator
1. Why choose us?
1. Schneider electric components;
2. Robot welding;
3. CE, ISO, GOST, CU-TR certificates;
4. 16 years' experience
5. Factory
2. Does your company supply other machineries?
We are manufacturer for construction machinery including tower crane, construction hoist and concrete batching plant with high quality. Customers can pick what they need from one cooperative partner to save time.
3.Trade terms?
Payment: T/T, L/C
Delivery:30 days, If there are stock machineries,the delivery time within 5 days.
MOQ:1set
4.what’s your company advantages?
Professional and Systematic manufacturer. Our team can offer more professional operation in International trade.
The process features for 2T Double Cage/Cabin SC200 Building Hoist Construction Elevator
1) Automatic submerged arc welding is adopted in the main section limbs and chord boom. It has high thermal efficiency, high penetration, high production efficiency, while reducing the pores and crack defects, increases the weld strength and the beautiful appearance.
2) We adopt carbon dioxide gas welding; it has heat concentrated, a small welding line, high strength and resistance to rust and crack. it can reduce tress and deformation, it has high strength and resistance to rust and crack.
3) Shot blasting is used for masts to strength the hardness of steel surface; enhance the paint adhesion and prolonging its life
Photos for 2T Double Cage/Cabin SC200 Building Hoist Construction Elevator





