design within 24 hours, 2 years warranty for crane parts-HYCRANE |
1.advanced design and reasonable and in line with national conditions, easy disassembly,stable performance, safe and reliable.
2.Agency-wide security agencies stop layer, multi-function security devices off eyelet facilities.
3.Adopt a progressive anti-dropping device, discounnet causde by wire rope hoists, hoists hugging by the brake on the column, without any parts damaged due to accident.
4.With a small crane, without the use of other lifting equipment, will be able to seif-help erection demolition.
5.Cage empty large size(3.8m*1.3m*2.0m),(3.0m*1.5m*2.0m).
6.Rigid frame and wall attached to the wall connection, no need to embrace wind rope, especially in the narrow venue construction, the advantage is more prominent.
construction lifting equipment also manufactured in our company, you can learn more by following information.
1.This Machine is used for erecting concrete box girders for high speed (250km,350km) passenger railway lines.
2.This machine is suitable for equal span girders or different span girders which can be 20m, 24m and 32m .
3.The rear part has two supports. One of the supports is "C" shape column with rotary and foldable technology. The “C” shape column technology saved the traverse space during traveling and which enables to travel through tunnels with the girder transfer vehicle.
Safety features:
1. Overload protection: If the material is over the capacity, the crane will give a sharp warning for protection itself.
2. Emergency brake: If the operation staff encounter some emergency situation, we could start the emergency brake system to protection the related treasure.
3. Control Method: Room control or remote control to avoid any injure to the operation staff
4. Main lifting motor: with thermal protection and currency protection.
Project Of Construction lifting equipment
|
||||||||||||||
Project1:Construction elevator | ||||||||||||||
3 sets crane for construction !
|
|
|||||||||||||
|
||||||||||||||
Project2:Tower crane | ||||||||||||||
3 sets crane for construction !
|
|
|||||||||||||
|
||||||||||||||
Project3:Launching girder crane | ||||||||||||||
3 sets crane for construction !
|
|
|||||||||||||