Product Name
hydraulic fittings and hoses
hydraulic hose adapter
1. Material checking: strictly control of material using, meet international requested standards;
2. semi-finished products inspection: product inspection before 100% finished ;
3. production line test: with work team or data engineer who will inspect machines and lines at fixed period.
4. finished product inspection: quality and property test before products are plated zinc, packed and loaded.