Advantages
1. Can pull steel sheet pile, cement pile, rail pile, iron plate, H steel, steel pipe, and will not hurt steel pipe pile, steel sheet pile and rail pile top or bottom.
2. Pulling the pile when the required tension is much less than other systems, can be suitable for a variety of different work site needs, quality and long life.
3. Can often work in the vicinity of the building will not damage the building itself, the use of high-performance imported shock absorber rubber block, quiet operation and shorter duration, help to overcome environmental problems.
Features
Technical Parameter
Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350L | FV-350 | FV-400 |
Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
Max.Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
About Us
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2014, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.
We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.
Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: One set is available.
Q: What's the payment method ?
A: We accept L/C, T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 1-8 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!