Specifications
Brand Name :
VIBRA
Model Number :
FV-330
Certification :
ISO 9001:2015
Place of Origin :
Shanghai, China
MOQ :
1 set
Price :
Negotiation
Payment Terms :
T/T, D/P, Western Union, MoneyGram
Supply Ability :
15 set/month
Delivery Time :
7-35 days
Packaging Details :
5.824 CBM
Name :
Cement coated Pile Driver/Vibro Hammer
Feature :
Up to 300 pile drive per day
Vibration :
3200 rpm
Pressure :
32 Mpa
Centrifugal Force :
372 KN
Max.Pile :
12 m
Extension Arm :
670 kg
Hammer weight :
2300 kg
Color :
Blue, customized color available
HS Code :
8430100000
Type :
Hydraulic Vibrating Hammer
Condition :
New
Description

Hitachi excavator mounted vibro hammer for cement square piling construction works

Our pile drivers can work with a variety of piles, square piles or round piles or other shape of steel piles.To ensure the high working efficiency of the whole machine, we use hydraulic systems with big power and great flow, the pile driving mechanism with multi-speed control and being quick in getting ready for operation. Here, customer is intending to drive 12 meter cement square piles near a canal.

Features

VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal, bridges, cofferdam, building foundation, etc.

With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.

Technical Parameter

Item FV-250 FV-280 FV-300 FV-330 FV-350L FV-350 FV-400
Vibration Frequency (rpm) 2500 2800 3200 3200 3200 3200 3200
Operation Pressure (Mpa) 30 32 32 32 32 32 32
Centrifugal Force (KN) 265 335 350 372 435 455 485
Max.Pile (m) 10 12 12 12 15 15 18
Arm (kg) 500 500 670 670 670 750 750
Hammer (kg) 1700 1900 2100 2300 2400 2600 2700
Excavator (T) 20-30 20-30 30-35 33-40 35-40 40-45 45-60

Working Principle

Hydraulic vibrating pile driver take the advantage of high frequency vibration generated by motor and transit the vibration force to the hydraulic vibrating pile driver for the surrounding soil liquefying & break its structure to reduce the friction; then piling or drilling the pile form the soil ground via excavator. The high frequency vibration is driven by the hydraulic motor of the excavator.

The hydraulic motor drives the two eccentric axes to rotate at high speed in opposite direction. The horizontal force of the eccentric axis cancels each other without vibration. The vertical forces add up to each other, creating a vertical-frequency vibration.

Machinery Characteristics

  • The control system adopts integrated import control valve, each action can be controlled independently, convenient for maintenance and check.
  • The vibration frequency is controlled at two stages, and the second stage vibration is the confluence of double pumps, which greatly increases the excitation force and overcomes the special geology.
  • Mini and light weight design make application flexible.
  • Taking the advantage of the excavator hydraulic system without other driving system requirement, which save fuel oil and transportation cost.
  • The operation is simple and easy to learn. The driver who has the operation foundation of excavator can operate it with practice

FAQ

Q: Are you a manufacturer?

A: Yes, we have been in this field for more than 12 years, our factory is in Suzhou and you are welcome to visit our unit anytime during working hour period,

Q: Who is your main customer?

A: Our customers are spreading all over the China with some abroad countries as well namely from New Zealand, Malaysia, Indonesia and many more are joining in the list. Brands like XCMG, SANY, Zoomlion, Caterpillar and Hyundai are our valuable customers.

Q: How long is the warranty period ?

A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.

Q: What is the MOQ ?

A: 1 set is available.

Q: What's the payment method ?

A: We accept T/T and D/P payment.

Q: What is the delivery time ?

A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.

Q: Can I have our LOGO on the machine ?

A: Of course you can.

Q: How is your product quality ?

A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".

Q: Can I be your dealer ?

A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!

Q: How to order?

A:
1. Please tell us the model with quantity and other requirement which you needed.
2. We issue the Proforma Invoice to you after confirmed the price and other details.
3. We arrange the order production upon receipt of confirmed PI and your deposit or original L/C.
4. After the goods is ready to ship, we will inform you the shipment date and other informations by email at the same time.
5. We will help to track your goods until you receive them safely.

Send your message to this supplier
Send Now

Hitachi Excavator Mounted Vibro Hammer For Cement Square Piling Construction

Ask Latest Price
Watch Video
Brand Name :
VIBRA
Model Number :
FV-330
Certification :
ISO 9001:2015
Place of Origin :
Shanghai, China
MOQ :
1 set
Price :
Negotiation
Contact Supplier
video
Hitachi Excavator Mounted Vibro Hammer For Cement Square Piling Construction
Hitachi Excavator Mounted Vibro Hammer For Cement Square Piling Construction
Hitachi Excavator Mounted Vibro Hammer For Cement Square Piling Construction
Hitachi Excavator Mounted Vibro Hammer For Cement Square Piling Construction

Shanghai Yekun Construction Machinery Co., Ltd.

Verified Supplier
6 Years
shanghai, shanghai
Since 2009
Business Type :
Manufacturer, Importer, Exporter, Seller
Total Annual :
800,000-10,000,0000
Employee Number :
100~150
Certification Level :
Verified Supplier
Contact Supplier
Submit Requirement