PCF series 18 meter vibrating pile driver for large pile driving construction projects
VIBRA PCF-450 hydraulic pile driver is widely used in high-speed railway, highway soft foundation compaction, construction, real estate, municipal, pipeline, bridge, rail transit, tunnel deep foundation pit support, trench, cofferdam, breakwater defense Infiltration reinforcement, etc. Suitable for all kinds of steel sheet piles, steel pipe piles, prefabricated concrete piles, photovoltaic piles, etc. It has the advantages of low fuel consumption, high efficiency and no damage to piles.
Features
VIBRA hydraulic vibratory hammer is the vibratory driving piling equipment which is popular among a wide variety of foundation projects.Apart from driving and pulling elements such as sheet piles and pipes, vibratory hammers are also used for soil densifying or vertical drainage, especially suitable for municipal , bridges, cofferdam, building foundation, etc.
With advanced technology, vibratory hammer has advantages of low noise, high efficiency, non-pollution and non-damage to piles,etc.
Technical Parameters
Item Model | PCF-300 | PCF-330 | PCF-350 | PCF-450 | PCF-500 | |
Vibration Frequency | rpm | 3500 | 3300 | 3500 | 3300 | 3200 |
Operation Pressure | Mpa | 32 | 32 | 32 | 32 | 32 |
Centrifugal Force | kn | 385 | 420 | 470 | 535 | 585 |
Max. Pile Length | m | 12 | 12 | 15 | 18 | 21 |
Arm Weight | kg | 750 | 750 | 750 | 820 | 820 |
Hammer Weight | kg | 2750 | 2850 | 2950 | 3150 | 3350 |
Excavator | T | 27~30 | 33~38 | 40~45 | 47~55 | 55~70 |
Equipment Advantage
Machinery Characteristics
FAQ
Q: Are you a manufacturer?
A: Yes, we have been in this field for more than 12 years, our factory is in Suzhou and you are welcome to visit our unit anytime during working hour period,
Q: Who is your main customer?
A: Our customers are spreading all over the China with some abroad countries as well namely from New Zealand, Malaysia, Indonesia and many more are joining in the list. Brands like XCMG, SANY, Zoomlion, Caterpillar and Hyundai are our valuable customers.
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!