850kg vibro hammer for small excavator performs 6 meter piling work
Mini Excavator Mounted Hydraulic Pile Driver
Mini hydraulic pile driver for the company's original products, its birth to fill the industry gap; Changed the history of small excavator can not be refitted pile driver; Solve the problem that small foundation pile can not be mechanized construction.
This series of models for the new rural reconstruction of the basic engineering construction has made an outstanding contribution.
Equipment advantages
One pile driver multiple types of piling work
Matched model: 6-18 ton excavator
Technical Parameters
Item | FV-100 | FV-150 |
Vibration Frequency (rpm) | 2500 | 2500 |
Operation Pressure (Mpa) | 30 | 30 |
Centrifugal Force (KN) | 117 | 172 |
Max.Pile Length (m) | 6 | 8 |
Arm Weight (kg) | 160 | 260 |
Hammer Weight (kg) | 850 | 1100 |
Excavator (T) | 7-12 | 12-17 |
Machinery Characteristics
About Us
Shanghai Yekun Construction Machinery Co., Ltd. was founded in 2009, A professional company involving in hydraulic vibrating pile driver manufacture, sale and service. Our company take the latest high speed hydraulic vibrating pile driver and its components as the main products. Our products vastly apply for infrastructure & construction industries.
We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver leads the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we cooperate actively with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ?
A: 1 set is available.
Q: What's the payment method?
A: We accept T/T and D/P payment.
Q: What is the delivery time?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine?
A: Of course you can.
Q: How is your product quality?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!