8 meter vibro hammer for mini backhoe suitable of all brand of excavator
Mini Hydraulic Pile Driver
FV-150 fills the industry gap. Changing history small excavator can not perform pile driving; Its mini structure, light weight with maximum vibrate moment makes it popular in the construction industry.
Equipment Advantage
Save Project Times – fast piling rates saves time and money, whole project duration is shortened
Vibrating Hammer – through compacted sands, out- driving much heavier vibrating hammers
High energy transfer efficiency to the pile – smaller hammer outperforms older more cumbersome equipment
Solid covered design – compatible with any excavator, simplifies application and handling
Matched model: 6-18 ton excavator
Application
1) It can applied in any kind earth like Clay, soft soil, sand layer ,etc
2) Noise regulated area
3) Suitable to use in vibration regulated areas, such as near buildings, precision instrument buildings, subway, overpass and so on.
Technical Parameter
Item | FV-100 | FV-150 |
Vibration Frequency (rpm) | 2500 | 2800 |
Operation Pressure (Mpa) | 30 | 32 |
Centrifugal Force (KN) | 117 | 172 |
Max.Pile (m) | 6 | 8 |
Arm (kg) | 160 | 260 |
Hammer (kg) | 850 | 1100 |
Excavator (T) | 7-12 | 12-17 |
About Us
We focus on product quality with the latest industrial technology. The mini hydraulic vibrating pile driver lead the industrial trend. The middle and large hydraulic vibrating pile driver also are highly recognized by our clients. At the same time, we actively cooperated with the engineering machinery factory and construction company to jointly develop more functional professional equipment, and we hired foreign professionals as our technical adviser.
Our company is consisting of a young, enthusiasm professional team. Adhere to client as priority, Quality as first concern, Management as foundation. We are working for the direction to become the most professional and comprehensive hydraulic vibrating pile driver manufacture and service supplier.
FAQ
Q: How long is the warranty period?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ?
A: 1 set is available.
Q: What's the payment method?
A: We accept T/T and D/P payment.
Q: What is the delivery time?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine?
A: Of course you can.
Q: How is your product quality?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises".
Q: Can I be your dealer?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!