Description
More secure and quicker than conventional Pile Drivers available, this model highlights a side and base clip to effectively pick up, tilt and turn piles for more precise outcomes.
VIBRA Side Grip Pile Driver is extraordinarily designed as excavator mounted vibro hammers. Side grip is handily adjusted to the excavator by association section created by VIBRA. They are hydraulically determined by the excavator and effortlessly worked by the excavator operator. With an ergonomic design and superior execution, different capacities excavator mounted VIBRA side grip pile drivers give long life, issue free piling application.
VIBRA side grip pile driver saves time and money with elite execution and pile driving/extracting power. Side Grip Vibratory Hammer, can deal with, pitch and drive the sheet and tube piles. It is able to achieve the entire pile driving cycle without the requirement for manual treatment of the piles or helping machinery.
Design Details
Gantry Hanger
Holding Clip System
Vibrating Body
Bottom Clip System
Benefits OF VIBRA SIDE GRIP PILE DRIVER
About Us
Ye Kun Construction Machinery Co., Ltd. is one specialized is engaged in the vibration sinking pile drawing machine equipment production, sale and service of technology-oriented enterprises, products mainly emerging a high-speed hydraulic pile drawing machine and peripheral accessories, equipment widely used in all kinds of foundation engineering construction.
After a short period of development, the company won the recognition of customers, and the annual sales growth doubled. Marketing the country with the VIBRA brand and export it. The company′s production of mini hydraulic pile driver, vibration hammer and other products quality has reached the advanced level of the industry.
FAQ
Q: How long is the warranty period ?
A: The warranty period is 12 months from the date of completion of installation, the mainframe and key components, except for wearing parts.
Q: What is the MOQ ?
A: 1 set is available.
Q: What's the payment method ?
A: We accept T/T and D/P payment.
Q: What is the delivery time ?
A: The delivery time is generally 7-35 days, and arrive at Shanghai Port. Shipping time should be considered overseas.
Q: Can I have our LOGO on the machine ?
A: Of course you can.
Q: How is your product quality ?
A: Our equipment is strictly implemented in accordance with the technical standards of "Technical Conditions for Pile Driver Enterprises ".
Q: Can I be your dealer ?
A: Welcome to become our dealer, and we are looking forward to further developing into a regional general agent and strategic partner like you with lofty ideals!