500kw micro hydro electric power generation for Hydro Power Plant
Overview
The Francis turbine fills a large gap between the Pelton and Kaplan and it is widely used. They operate in water head from 10 to 600 meters, and are primarily used for electric power generation. Their power output can be calculated from the water head and flow rate and typically range from 10 to more than 700 megawatts. One of the distinct advantages of the Francis turbine with respect to other water turbines is that they can also be used as water pump. This makes them ideal for a pumped storage systems.
Francis hydro turbine are the most widely used type of hydro turbine about 60% of the global hydropower capacity around the world.
Hongya hydro power has continuously invested in R&D to increase turbine efficiency and developed specific product enhancements to improve
machine performance.
we have successfully completed numerous installations of Francis turbines more than 300 units in past 20 years.
Francis turbines are very able to sustain the high mechanical stress resulting from high heads which consit of spiral casing, stay vans, guide vane,runner, draft turbe.
We provide customers with the complete package, from the design and manufacture of the turbine, generator and control equipment through to installation, commissioning and ongoing repair and maintenance.
Specification
Name | 500kw micro hydro electric power generation for Hydro Power Plant |
Water Head | 57m |
Runner Diameters | 0.8 m |
Capacity | 500KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | Horizontal |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 30~50 years |
1. The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b. Regular maintenance and inspection
c. Technical Training Program for Power Plant Personnel
d. General Overhaul
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant
c. Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.
Why choose us?
1. More than 20 years of industry experience, install commissioning more than 150 equipment each year
2. Provide complete proposal for hydro power plant from water to wire
3. Abundant foreign power plant project implementation experience such as France, Japan, USA, South Africa, Sri Lanka, Iran, Southeast Asia
4. Design and manufacture of hydro power generator with voltage 400V,6.3KV . capacity exceed 1000kw with 400V
FAQ
1. You are a trading company or a manufacture?
We are a hydro turbine generator manufacture with over 20 years of experiences, Our factory is in the Sichuan you will take 2 hours driving after you reach Shuangliu Airport, pay a visit to our factory you will know more about us.
2. What Kind of water turbine should I choose?
We need to know water head, flow rate, voltage level, frequency, on-grid or off-grid running, automation level from you to work out the solution
3: Can you do the EPC for the hydro power plant?
Yes, We can design, producing and install the equipment, we will dispatch technologist and workers to install the equipment.