Stainless Turgo Impulse Wheel
The operation of a Turgo turbine is very similar to that of a Pelton turbine. In this type of turbine, high speed jets of water emerge from the nozzles that surround the turbine. These nozzles are arranged so the water jet will hit the buckets on one side at an angle of around 20°.This shallow angle allows the water stream to exit on the other side instead of being diverted backwards. Since the incoming and outgoing jets don't interfere like they do in Pelton turbines, this type of turbine is able to accommodate a higher flow rate.
Polishing based on CMM measurement report
Experienced employees polishing according to customer specific procedures
Several dimensional and quality controls through process
Compliance with all environmental standards thanks to the newest filtering technologies
Completed products are checked using four non-destructive testing methods (NDT).
Visual Testing (VT)
Liquid Penetrant Testing (PT)
Magnetic Particle Testing (MT)
Ultrasonic Testing (UT)
The actual unbalance is displayed in one or two planes by graphical and numerical output. There is also a deviation from the allowed unbalance displayed and a suggestion for the most convenient weight correction.
specification
runner material | stainless steel |
runner type | Kaplan |
diameter | 1.2m |
capacity | 1300kw |
blade No | 18PCS |
weight | 950KG |
The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.
Why choose us?
1. More than 20 years of industry experience, install commissioning more than 150 equipment each year
2. Provide complete proposal for hydro power plant from water to wire
3. Abundant foreign power plant project implementation experience such as France, Japan, USA, South Africa, Sri Lanka, Iran, Southeast Asia
4. Design and manufacture of hydro power generator with voltage 400V,6.3KV . capacity exceed 1000kw with 400V
FAQ
1.You are a trading company or a manufacture?
We are a hydro turbine generator manufacture with over 20 years of experiences, Our factory is in the Sichuan you will take 2 hours driving after you reach Shuangliu Airport, pay a visit to our factory you will know more about us.
2.What Kind of water turbine should I choose?
We need to know water head, flow rate, voltage level, frequency, on-grid or off-grid running, automation level from you to work out the solution
3: Can you do the EPC for the hydro power plant?
Yes, We can design, producing and install the equipment, we will dispatch technologist and workers to install the equipment.