750kw Water Electricity GeneratorFor Micro Hydro Power Plant
overview
We can supply hydraulic turbines system , hydro turbine system such as kaplan turbine, propeller turbine, francis turbine and pelton turbine, turgo turbine and so on, also with speed governor, generator, valves, excitation system and its other accessories.
In order to guarantee the product quality, the company has advanced testing instruments and strictly defers to ISO9001 quality management system.It is strictly controlled the quality in every process to assure the high level,fineness and no bug of products.
Regardless of size, all turbines are manufactured with only high-quality components, and undergo rigid quality inspections to ensure high efficiency and reliable operation.
All of our medium and large hydro generators are engineered to reduce thermo-mechanical stress on the generator structure, which contributes to
improved reliability and extended lifetime. Additionally, our generators come with a stator core pressing system to ensure that pressing force is
provided precisely where it is needed: in the core.
A closed loop air ventilation circuit is standard with our machines and, when necessary for the site conditions and generator
configuration, we offer state-of-the-art cooling systems.
Specification
Name | 750kw water turbine generator |
Capacity2 | 750KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | horizontal |
Material(coil) | copper |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
we supply complete package for hydro power plant
1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a. Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b. Regular maintenance and inspection (Optional)
c. Technical Training Program for Power Plant Personnel (Optional)
d. General Overhaul (Optional)
6. Installation & Testing
a. Installation & testing for all systems & equipment provided by Runh Power
b. Installation, testing & trail run of all systems of a power plant (Optional)
c. Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(