2000kw Micro Hydro Power Generator For Micro Hydro Power Plant
overview
Hydro turbine generator is droved directly or indirectly by hydro turbine. The rotating speed is less than 1500r/min, with horizontal and vertical arrangement. Excitation mode with brushless and static silicon type.
Components including stator, rotor,base frame, bearing, excitation motor or collecting ring. The outlet voltage from 400V to 13.8KV, and frequency could be 50Hz or 60Hz, output from 50Kw to 50Mw. Our generator are high efficiency, reliable, manufacture and tests all follow related IEC standards.
medium and large hydro generators are designed for run-of-river and high head hydropower plants.
Our knowledge and experience in Hydropower allows our team to match customers with the best technology for their site.
Low-speed machines ideal for run-of-river plants in connection Kaplan turbines; and High-speed machines used with Francis and Pelton turbines for high head hydro power
All of our medium and large hydro generators are engineered to reduce thermo-mechanical stress on the generator structure, which contributes to
improved reliability and extended lifetime. Additionally, our generators come with a stator core pressing system to ensure that pressing force is
provided precisely where it is needed: in the core.
A closed loop air ventilation circuit is standard with our machines and, when necessary for the site conditions and generator
configuration, we offer state-of-the-art cooling systems.
Specification
Name | 2000kw Hydro Electric Power Generator |
Capacity2 | 2000KW |
Frequency | 50HZ |
Generator Voltage | 6300V |
Layout pattern | vertical |
Material(coil) | copper |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
our service package as follows
1.The Argumentation of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling) (Optional)
b.Regular maintenance and inspection (Optional)
c.Technical Training Program for Power Plant Personnel (Optional)
d.General Overhaul (Optional)
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant (Optional)
c.Installation, testing & trail run of entire power plant (Optional)
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.(