600kw Turgo Water Turbine Generator For Hydro Power Plant
overview
Turgo turbine is one of impulse turbine, applicable water head 30 to 300 meter. The center of jet flow with runner gyration plane angled 22.5°. the water flow contracted by the spray nozzle , flows entering one side of runner and comes out from other side. The structure is simple and easily inspected and maintained.
Specification
Name | 600kw Turgo Micro Wheel Hydro Generator |
Water Head | 108.0m |
Runner Diameters | 0.72 m |
Capacity2 | 400KW |
Frequency | 50HZ |
Generator Voltage | 400V |
Layout pattern | vertical |
Material(blades) | Stainless Steel ZG0Cr13Ni4Mo |
Excitation | Brushless |
Generator Insulation | F/F |
Lifespan | 50 years |
Advantages
Covers the boundary between Francis and Pelton
Limits Over-Pressure Effect over the penstock
Higher speed = weight and cost reduction
Maintains efficiency over a wide flow range
Superior abrasion resistance
Ease of operation and maintenance
our service:
1. The package of Project
a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3. Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.