Specifications
Brand Name :
UST
Model Number :
DIA10-100mm,80-800mm
Certification :
ISO9001
Place of Origin :
China
MOQ :
MOQ: 3 ton
Price :
USD 1500- 2300/ton
Payment Terms :
L/C, T/T
Supply Ability :
1200 ton/month
Delivery Time :
Within 5-35 days
Packaging Details :
Plastic plugs in both ends, Hexagonal bundles of max 2,000kg with several steel strips, Two tags on each bundle, Wrapped in waterproof paper, PVC sleeve, and sackcloth with several steel strips.
Usage :
Mechanical
Production Technique :
hot rolled, hot forged
Quality Standard :
ASTM; DIN; JIS
Surface :
Balck or bright
Delivery condition :
Annealed
Inspection :
The third party is acceptable
Description

D3/Cr12/DIN1.2080/SKD1 Cold Work Tool Steel Round Bar, Small MOQ, tool steel


Applications: High performance cutting tools for sheet upto 4mm Thickness, trimming dies, blanking

dies for paper and plastic,shear blades for cutting light gauge material, thread rolling dies , drawing, deep drawing, Pressure pads and highly wear-resistant plastic moulds.

Steel Grade:
GB Cr12

C Si Mn P S Cr
2.0 - 2,30 <= 0,40 <=0,40 <= 0,030 <=0,030 11,50 - 13,00

DIN-1.2080

C Si Mn P S Cr
1,90 - 2,20 0,10 - 0,40 0,15 - 0,45 <= 0,030 <= 0,030 11,00 - 12,00

Similar grade:AISI-D3,JIS-SKD1, DIN 1.2080

Delivery Condition:

GB/T1299-2000 DIN AISI
Annealed (HB) 269~217 <=250 255~217
Harden(HRC) 58~60 57~63 54~61

Size available:

Flat:15-150mmx80-1200mm Square: 12mm-450mm, hot rolled: 10-100mm, hot forged: 80-800mm

Surface: Black/Turned

Heat Treatment

D3 tool steel requires hardening and tempering to achieve maximum properties. For maximum accuracy, the parts of D3 tool steel should be stress relieved after roughing operations. Stress should be relieved at 648°C (1200°F) for one hour and cooled slowly.

Annealing

Annealing of D3 tool steel needs to be done in a controlled atmosphere furnace. D3 tool steels should be heated thoroughly to 871°C (1600°F) and cooled slowly at a rate of not more than -6°C (20°F) per hour, until the furnace is black. Then the material should be removed and air cooled.

Tempering

The D3 tool steel should be cooled to room temperature and should be tempered immediately. The parts should be placed in the tempering furnace and increased slowly to the desired tempering temperature. Tempering for 1 hour per inch of thickness is required.

Hardening

D3 tool steel should be heated properly since it is very sensitive to overheating and if not heated maximum hardness cannot be achieved. The work should be directly placed in a furnace preheated to 954°C (1750°F) and soaked for 20-25 minutes, plus 5 minutes per inch of thickness, and then oil-quenched to harden it.

Send your message to this supplier
Send Now

Hot Forged / Rolled Tool Steel Round Bar D3 / Cr12 / DIN1.2080 / SKD1 Steel Grade

Ask Latest Price
Brand Name :
UST
Model Number :
DIA10-100mm,80-800mm
Certification :
ISO9001
Place of Origin :
China
MOQ :
MOQ: 3 ton
Price :
USD 1500- 2300/ton
Contact Supplier
Hot Forged / Rolled Tool Steel Round Bar D3 / Cr12 / DIN1.2080 / SKD1 Steel Grade
Hot Forged / Rolled Tool Steel Round Bar D3 / Cr12 / DIN1.2080 / SKD1 Steel Grade
Hot Forged / Rolled Tool Steel Round Bar D3 / Cr12 / DIN1.2080 / SKD1 Steel Grade
Hot Forged / Rolled Tool Steel Round Bar D3 / Cr12 / DIN1.2080 / SKD1 Steel Grade

SHANGHAI UNITE STEEL

Active Member
9 Years
shanghai, shanghai
Since 2010
Business Type :
Manufacturer, Distributor/Wholesaler, Agent, Exporter, Trading Company, Seller
Total Annual :
10000000-25000000
Employee Number :
50~110
Certification Level :
Active Member
Contact Supplier
Submit Requirement