Product Description
Model Number:EF3-40 EF2-32
Delivery:3-5 days
MOQ:10pcs
Warranty:1 years
Package:According to your request
Shipment:By sea to your nearest port
By air to your nearest airport
By express (DHL, UPS, FEDEX, TNT, EMS) to your door
The filter is a necessary hydraulic accessory of the hydraulic system, and its structure is composed of air filtration and refueling
The filter consists of two parts. It is directly installed on the oil tank cover plate, which can filter the operation of the hydraulic system
The dust brought into the oil tank by the air can filter out the particles brought in during refueling
Therefore, the structure of the oil tank is simplified, which is conducive to the purification of oil.
The filter adopts copper based powder metallurgy sintered filter, which has stable filtering precision and strength
Large, strong plasticity, easy to disassemble and wash. And can withstand thermal stress and impact and work normally at high temperature
characteristic.
When the hydraulic system works, the liquid level in the oil tank rises and falls again, and when it rises, it is discharged from the inside to the outside
The air is inhaled from the outside to the inside when descending. In order to purify the air in the oil tank, it is installed on the oil tank cover plate
The air filter can filter the inhaled air. At the same time, the air filter is the fuel tank
At the oil port, the newly injected working oil enters the oil tank through the filter. It can filter out the dirt in the oil
Dye particles
In the hydraulic system, purifying the working oil is a very important link. Air filter energy
Keep the oil in the oil tank clean to prolong the working cycle and service life of oil and components
So as to ensure the normal operation of the hydraulic system. In addition, the hydraulic system has no working time
The air filter can maintain the balance between the pressure in the oil tank and the atmospheric pressure to avoid possible cavitation
Phenomenon.
Related Products
Package Detail
1. Inside packing box . One filter one small carton box .
2. Outside big packing box .
3. Each carton with packing belt before shippment .
4. Arrange shippment by vehicle
Trade shows
Buyer Feedback
Customer
Payment
Payment terms: Western Union, Money Gram, T/T,L/C
30% advance, the balance paid before packing
Please remember to leave the correct contact information for delivery.
Shipment
Shipping terms: DHL, UPS, FEDEX, TNT, EMS
Port is Tianjin ,Qingdao, Shanghai or as requests
FAQ
Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages
before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
We sincerely hope to cooperate with you !!!