Specifications
Brand Name :
T-works
Model Number :
SMW-160
Certification :
ISO9001 & GOST & SGS & CE
Place of Origin :
Hunan, China (Mainland)
MOQ :
1SET
Price :
Negotiable
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
250 Set/Sets per Year Drilling rig
Delivery Time :
40days after deposit received
Packaging Details :
Nude packing for main body, plastic package for main parts
Condition :
New
Piling Speed(m/min) :
1 M/min( Within 30 Miles)
Efficiency :
98%
Dimension(L*W*H) :
according to the model
movement type :
crawler type or walking type
After-sale service :
Engineer available any time
Warranty :
12 months
Description
SMW method multi-shaft drill rig 160 for bored secant pile

Product Description

SMW, which is short of Soil Mixing Wall, is a construction method developed in Japan in 1976. Now it consists 50% of underground continuous wall constructions in Japan, and widely adopted in countries in southeast Asia, the United States, France etc. In Shanghai, Hangzhou, Nanjing and other cities of China, SMW becomes quite popular after its introduction years ago.
SMW uses multi-shaft auger to drill soil in situ, meanwhile pumps cement grout from the tips of the augers into the drilled holes. After sufficient mixing of the grout, H-shaped steel or other types of steel are embedded into the columns before the soil-cement mixture hardened, forming a underground continuous wall with rigidity and intensity. The wall could be used as retaining support or water seal. Three-shaft auger machine is commonly used.

SMW method has the following advantages:

1.Low cost. Foundation retaining using SMW method with three-shaft auger machine is much more competitive in price than traditional method when constructing underground continuous wall.
2.Shorter construction period. SMW method consumes much less time than other methods. Under normal geographical conditions, it could build 70-80m² walls per shift.
3.Good seal quality. The wall is continuous without any cracks. Hydraulic conductivity can reach as much as 10-7cm/s.
4.No disturbance in nearby soils. SMW method would not cause hazards like ground subsidence, building inclining, road cracks or shift of underground facilities.
5.Wide range in use. It can be applied on cohesive soil, silt , sandy soil, gravel soil.
6.the waste soil is far less than other construction methods.

SMW-160 Drilling Rig Parameters:

item unit SMW-160
total leader length (m) 39
leader diameter (mm) Φ920
leader oriented center distand (mm) 600
leader angle adjustment range (º) ±1.5
diagonal bracing cylinder stroke (mm) 2800
max drilling model (mm) ZLD85-5
double hydraulic
winch
(hanging drilling,
liftting winch)
single pulling force (kN) 800
(kN) 12
wire rope diameter (kN) Φ22
rope capacity (m) 550
hydraulic winch (hanging drill pipe, hanging pile) single pulling force (kN) 4
rope capacity (m) 120
platform rotary angle (º) ±10
pile frame movement longitudinal step (mm) 3600
horizontal step (mm) 600
Supporting leg rise height (mm) 500
Horizontal track plate length (mm) 10600
width (mm) 1200-1400
longitudinal track plate length (mm) 7000
width (mm) 1800
motor power (kw) 60
hydraulic system pressure (Mpa) 18
total piling weight (t) 145
Send your message to this supplier
Send Now

Eco Bore Pile Machine , Excavator Mounted Pile Driving Equipment

Ask Latest Price
Brand Name :
T-works
Model Number :
SMW-160
Certification :
ISO9001 & GOST & SGS & CE
Place of Origin :
Hunan, China (Mainland)
MOQ :
1SET
Price :
Negotiable
Contact Supplier
Eco Bore Pile Machine , Excavator Mounted Pile Driving Equipment
Eco Bore Pile Machine , Excavator Mounted Pile Driving Equipment

Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Active Member
7 Years
hunan, changsha
Since 2005
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
20000000-30000000
Employee Number :
270~300
Certification Level :
Active Member
Contact Supplier
Submit Requirement