Specifications
Brand Name :
T-works
Model Number :
ZYC280
Certification :
CE,GOST
Place of Origin :
HUNAN,CHINA
MOQ :
1 unit
Price :
Negotiable
Payment Terms :
L/C, T/T, D/P, Western Union
Supply Ability :
15 units per month
Delivery Time :
30-45 days after deposit received
Packaging Details :
Nude package for main body, plastic package for key parts
Product Name :
Hydraulic Static Pile Driver
Max driving force(KN) :
2800
Rated Piling Pressure(KN) :
2800
Piling Stroke(m) :
1.8
Piling Speed(m/min) :
7.2
Total weight :
With counterweight total 280Ton
Rise stroke(m) :
1
Piling engine(KW) :
60
Description

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

1. Description:

ZYC series hydraulic static pile driver is a new environmentally friendly pile foundation construction equipment with a number of national patents. It has the features of no pollution, no noise, no vibration, and fast pile driving, high quality pile. It is represent the future development tendency of pilling machinery.

2. Applications:

  • Clay, soft soil, sand layer, etc.
  • Noise regulated urban area.
  • Vibration regulated areas where traditional methods may threaten the stability of existing structures.

3. Specifications:

Parameter/Model ZYC280
Rate piling pressure(KN) 2800
Piling speed(m/min) Fast 7.7
Low 1.8
Piling stroke(m) 1.9
Pace(m) Longitudinal 2.4
Horizontal 0.6
Angle range(°) 15
Rise stroke(m) 1.0
Square pile(mm) Max 500
Circle pile(mm) Max 500
Side piling(mm) 900
Corner piling space(mm) 1800
Lifting weight(t) 12
Pile hanging length(m) 14
Power(KW) Piling 60
Lifting 30
Main dimension(m) Work length 12
Work width 6.1
Transpot height 3.1
Total weight(t) 280

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

5. After sale service and quality gurantee

1) To train operating,maintenance and construction people for our customers.

2) Always be ready to answer technical questions concerned from our customers.

3) Be responsible for the quality of our products and provide technical service of installing,making ajustment,testing and maintenance on the site in time.

4) To dispatch technicans to the worksite at short notice to solve problems or fix breakdowns.

5) Keep a record of our customers and be informed of the working performance of our products,feedback and suggestions of our customers so as to make a good cooperation with customers.
6) We guarantee to keep our Main Machine in good repair for 1 year after sale and 6 months for accessories. In the guarantee time, any quality problem caused by manufacturing after confirmation of us shall be repaired for free; Exceed the guarantee time, we can also supply repair services to our products charged for repair cost only.

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

Send your message to this supplier
Send Now

Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

Ask Latest Price
Brand Name :
T-works
Model Number :
ZYC280
Certification :
CE,GOST
Place of Origin :
HUNAN,CHINA
MOQ :
1 unit
Price :
Negotiable
Contact Supplier
Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality
Precast Concrete Pile Foundation Equipment ZYC280 7.7m/Min Piling Speed With Excellent Quality

Changsha Tianwei Engineering Machinery Manufacturing Co., Ltd.

Active Member
7 Years
hunan, changsha
Since 2005
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
20000000-30000000
Employee Number :
270~300
Certification Level :
Active Member
Contact Supplier
Submit Requirement