Rexroth Direction Valve 4WE6D62 OFEG24N9K4
Rexroth direction valve is a device used to control the direction of oil flow in the hydraulic system, which can realize the start, stop and direction change of hydraulic oil. Specifically, the working principle of Rexroth direction valve mainly includes the following steps:Initial position: The initial position of the valve (normally open "UK" or normally closed" CK ") is determined by the arrangement of the spring. The cavity after closing the element is connected to the oil port P and sealed off from the oil port T.The role of the electromagnetic coil: When the electromagnetic coil is energized, the electromagnet suction will push the valve core, thereby changing the working position of the valve.Fluid control: Through special closing elements, the oil ports P, A and T can be loaded to the working pressure and the fluid can flow in both directions.Manual emergency operation: The position of the valve can also be changed by manual emergency operation without energizing the coil .In addition, Rexroth direction valve has a variety of different types, such as slide valve, rotary valve, ball valve, cone valve, etc., they can be selected according to different needs and working environment. In general, the design and working principle of Rexroth directional valves are designed to meet the needs of precise control of the direction of oil flow in hydraulic systems.
Brand | Rexroth |
Type | 4WE6D62 OFEG24N9K4 |
Operating voltage | 220V |
Size | 6 |
Shaft Diameter | 5mm |
Speed | 3000 RPM |
Weight | 2kg |
Power Source | Electric |
Operating Temperature | -20°C to 80°C |
Material | Steel |
Current | 1.5A |
FAQ
Q1: Wonder if you accept small orders?
A1: Do not worry. Feel free to contact us .in order to get more orders and give our clients more convener ,we accept small order.
Q2: Can you send products to my country?
A2: Sure, we can. If you do not have your own ship forwarder, we can help you.
Q3: What's your payment terms ?
A3: By T/T,LC AT SIGHT,100% full payment.
Q4: How long is your production lead time?
A4:It depends on product and order qty. Normally, it takes us 15 days for an order with MOQ qty.
Q5: When can I get the quotation ?
A5: We usually quote you within 24 hours after we get your inquiry. If you are very urgent to get the quotation.Please call us or tell us in your mail, so that we could regard your inquiry priority.