Low Head Hydro Power Generator Efficiency 500KW With Stainless for Sell
Tubular turbine has been divided into Bulb tubular and shaft extension tubular according to the arrangement.Main components including: runner, draft cone, water chamber, guide vane, bearing, and main shaft. The spiral case could be steel or concrete. Turbine units normally be horizontal shaft arrangement. Generator equipped with same or different shaft, with Anyway, they will share the same rotating speed. If specially required, a speed increase gear could be equipped between turbine and generator in order to smaller the generator size.
Product features :
1. Compact structure, easy to install, less civil works needed.
2. Horizontal-axis type and simple flow channel design.
3. Efficiency from 80%-91%, good output when flow is stable.
4. It can be used at low head and stable big water flow water turbine project the same as Propeller turbine.
5. Power plant from influent to effluent direction basically is communicated in axial direction.If the buld turbine hydropower station water inlet outlet pipesare not turning,simple shape,flow channel to reduce the hydraulic loss,convenient construction.
6.Tubular turbine with high flow ability high specific speed,so in the head and power under the same conditions tubular turbine propeller diameter than about 10%;
7.Tubular turbine hydropower station has the advantages of compact structure,compared with the same specifications of Kaplan turbine to its relatively small size,can be arranged in the dam,cancel diversion system complex,reduce the workshop building area,reduce the amount of excavation and concrete plant,according to the analys is of revevant data,civil construction cost can save 20%-30%;
8.Turgo hydropower station in general than the vertical axial flow type hydropower station construction period is short,fast effect.
Tubular Turbine Generator Product Parameters
T03-45 Tubular turbine performance data and supporting table | ||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Water Intake | ||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | Diameter (mm) | |||
Flow rate (m3/s) | The output(kw) | |||||||
T03-45 | 5 | 0.91 | 37 | 745 | 35 | 750 | straignt league | 500 |
5.5 | 0.95 | 43 | 782 | 40 | 750 | |||
6 | 0.99 | 48 | 816 | 45 | 750 | |||
6.5 | 1.03 | 55 | 850 | 55 | 750 | |||
7 | 1.07 | 61 | 882 | 60 | 750 | |||
7.5 | 1.11 | 68 | 913 | 65 | 1000 | |||
8 | 1.15 | 75 | 943 | 75 | 1000 | |||
8.5 | 1.18 | 82 | 972 | 80 | 1000 | straignt league | ||
9 | 1.22 | 89 | 1000 | 85 | 1000 | |||
9.5 | 1.25 | 97 | 1027 | 95 | 1000 | |||
10 | 1.28 | 104 | 1054 | 100 | 1000 | |||
10.5 | 1.31 | 112 | 1080 | 110 | 1000 | |||
11 | 1.34 | 120 | 1106 | 120 | 1000 |
Product pictuers:
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Europe, Asia, South America, North America, etc., and as partners, we are qualified as long-term suppliers in many regions.
The capacity of hydro turbines is up to 50KW-30MW for a unit. The main hydro turbines areTurgo turbine ,pelton turbines, francis turbines, kaplan turbines ,bulb tubular turbines and other types of turbines.Foster also supplies governors, valves, transformers, monitoring systems, microcomputer integrated control panels and other equipment for hydroelectric power plants.
Our main products included
(1) Low head kaplan turbine generators series.
(2) Middle high head Turgo turbine generators series,e.g. vertical type horizontal type.
(3) Low head Tubular turbine generators series ,e.g. Bulb type and shaft extension type.
(4) Medium headFrancis turbine generators series.
(5) High head turbine generators series and double turbine generators series and so on.
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4, Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6, How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7, Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com