The tubular turbine requires less space than other turbines, a saving in civil costs is realized due to a smaller powerhouse and shallow requirements for the draft tube, which is equipped with adjustable wicket gates and adjustable runner blades. This arrangement provides the greatest possible flexibility in adapting to changing net head and changing demands for power output; Because the gates and blades can be adjusted to their optimum openings.
The tubular turbines are the best selection for exploitation of tidal power and hydraulic power with extremely low heads and extremely large flow rates. They have large discharge, high specific and high efficiency, and need less excavation.
Tubular turbine is a new hi-tech product. It is well suitable for hydropower plants with water head ranging from 2 m to 10 m and unit capacity below 15MW. It has the following particular advantages: Its efficiency is higher than shaft-extension type tubular units and axial flow units; its cost is lower than axial flow units and bulb tubular units, and it is convenient to operate and maintain. Pit type tubular turbine is divided into fixed blade type (GD) and moveable blade type (GZ).
502-40 turbine performance data and supporting table | |||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | ||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | Rated speed(r/min) | |||
Flow rate (m3/s) | The output(kw) | ||||||
502-40 | 5.5 | 0.6 | 28 | 762 | 25 | 750 | Direct connection |
6 | 0.63 | 31 | 796 | 30 | 750 | ||
6.5 | 0.65 | 35 | 829 | 35 | 750 | ||
7 | 0.68 | 40 | 860 | 40 | 750 | ||
7.5 | 0.7 | 44 | 890 | 45 | 750 | ||
8 | 0.72 | 48 | 919 | 45 | 1000 | ||
8.5 | 0.75 | 53 | 948 | 50 | 1000 | ||
9 | 0.77 | 58 | 975 | 55 | 1000 | ||
9.5 | 0.79 | 63 | 1002 | 60 | 1000 | ||
10 | 0.81 | 68 | 1028 | 65 | 1000 | ||
10.5 | 0.83 | 73 | 1053 | 70 | 1000 | ||
11 | 0.85 | 78 | 1078 | 75 | 1000 | ||
11.5 | 0.87 | 83 | 1102 | 80 | 1000 | Direct connection | |
12 | 0.89 | 89 | 1126 | 85 | 1000 | ||
12.5 | 0.91 | 94 | 1149 | 90 | 1000 | ||
13 | 0.92 | 100 | 1172 | 100 | 1000 | ||
13.5 | 0.94 | 106 | 1194 | 105 | 1000 | ||
14 | 0.96 | 112 | 1216 | 110 | 1000 | ||
14.5 | 0.97 | 118 | 1238 | 115 | 1000 | ||
15 | 0.99 | 124 | 1259 | 125 | 1000 | Direct connection | |
15.5 | 1.01 | 130 | 1280 | 130 | 1000 | ||
16 | 1.02 | 137 | 1300 | 135 | 1500 | ||
16.5 | 1.04 | 143 | 1320 | 140 | 1500 | ||
17 | 1.06 | 150 | 1340 | 150 | 1500 | ||
17.5 | 1.07 | 156 | 1360 | 155 | 1500 | ||
18 | 1.09 | 163 | 1379 | 160 | 1500 | Direct connection | |
18.5 | 1.1 | 170 | 1398 | 170 | 1500 | ||
19 | 1.12 | 177 | 1417 | 175 | 1500 | ||
19.5 | 1.13 | 184 | 1435 | 180 | 1500 | ||
20 | 1.14 | 191 | 1453 | 190 | 1500 | ||
20.5 | 1.16 | 198 | 1472 | 195 | 1500 | ||
21 | 1.17 | 205 | 1489 | 200 | 1500 |
Tubular Turbine Generator Product pictures:
Chengdu Forster Technology is focused on design and manufacturing hydro turbines. The company was founded in 1956. Forster is the first Chinese state-owned enterprise and spares no effort to expand international market in 2013,At present, we have obtained orders in many water-rich areas such as Europe, Asia, South America, North America, etc., and as partners, we are qualified as long-term suppliers in many regions.
The capacity of hydro turbines is up to 5KW-300MW for a unit. The main hydro turbines are Turgo turbine ,pelton turbines, francis turbines, kaplan turbines ,bulb tubular turbines and other types of turbines.Foster also supplies governors, valves, transformers, monitoring systems, microcomputer integrated control panels and other equipment for hydroelectric power plants.
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4, Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, How many an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6, How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7, Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com