Specifications
Brand Name :
Forster
Model Number :
CJA237/475-W-90
Certification :
ISO9001/CE/TUV/From-E
Place of Origin :
Sichuan province,in China
MOQ :
1 SET
Price :
Negotiable
Payment Terms :
L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability :
500 Set/Sets per month
Delivery Time :
12 0work dayes
Packaging Details :
wooden box
Design Head :
275m to 700m
Design Flow :
0.0860 m³/s to
Power :
176KW to 1500KW
Generator phase :
number: 3 phase / single phase
Generator :
3-phase alternator
Installation method :
horizontal installation / vertical installation
Description

Water Wheel Hydro Generator Hydro Generator Turbine Pelton Easy to Operate

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

In Pelton turbine, according to the relative position of working jet and runner and the number of times of work, it can be divided into: cut-impact turbine (bucket type, the most widely used) inclined-impact turbine double-stroke turbine 2, impact turbine and counterattack turbine 1, the working principle and counterattack turbine of the same point impact turbine The percussive turbine transmits the energy of water flow to the runner by the principle of interaction and reaction between water flow and runner blade, which releases the mechanical energy from the runner rotation. Main Types and Working Characteristics of Impulse Turbines II. Similarities and Differences between Impulse Turbines and Counter-Impulse Turbines III. Structures and Main Working Components of Cut-Impulse Turbines I. Main Types and Working Characteristics of Impulse Turbines. Pelton Turbines are free injection of kinetic energy by means of special guiding mechanisms (nozzles). Flow, rush to the runner bucket, make the runner rotate and do work, thus completing a hydraulic prime mover that converts water energy into mechanical energy.

1, Power station from water to water direction is basically the axial direction penetration.such as bulb turbine hydropower station of the feed water control and outlet pipe bend, simple shape, the path of circulation of hydraulic damage reduction,convenient construction .

2, Tubular turbine has high flow ability and larger specific speed, so when the head and power are under the same conditions,tubular turbine diameter is about 10% smaller than Turn to paddle

3, Hydro-power unit structure is compact,compared with the same specifications of paddle unit,Its size is small,and it can be decorated in dam body,cancel the complex diversionsystem,reduce the construction area of factory building,reduce the excavated volume and the amount of concrete,according to the relevant data analysis,construction cost can be saved 20%-30%.

4, Tubular turbine work for reversible pump turbine running, due to the in and out of the water without a sharp turn working condition of pump and the turbine can get a better hydraulic performance.Such as tidal power station can be two way with applications in power generation,pumping,drainage and other three kinds of functions.Therefore,it is suitable for comprehensive exploitation and utilization of low head hydraulic resource.

5, Hydro-power is short in construction period, and results fast generally than vertical axial-flow hydro-power station .

Unlike other types of turbines which are reaction turbines, the Pelton turbine is known as an impulse turbine. This simply means that instead of moving as a result of a reaction force, water creates some impulse on the turbine to get it to move.

Product parameters:

Pelton tubine generator unit Generator Unit output (kw)
Turbine
Type Water head(m) Discharge (m³/s) Output(kw) Speed (r/min) Type Capacity (kw)
CJA237/475-1*7 200 0.232 383.2 750 SFW320-8/850 320 358.3
220 0.243 440.5 SFW400-8/850 400 414.1
240 0.254 502 SFW500-8/850 500 474.4
260 0.264 572 1000 SFW500-6/850 500 540.5
280 0.274 643.5 SFW630-6/990 630 608.1
300 0.284 714.6 SFW630-6/990 630 675.3
CJA237/475-W-90/1*4.5 275 0.086 176.3 750 SFW160-8/650 160 162.9
300 0.0896 200.4 SFW200-8/740 200 185.8
325 0.0932 225.8 SFW200-8/740 200 209.3
350 0.0969 252.8 SFW250-8/740 250 235.1
375 0.1005 279.8 SFW250-8/740 250 260.2
400 0.103 309 1000 SFW250-8/740 250 287.4
425 0.1077 341.3 SFW320-6/740 320 320.1
450 0.1098 368.4 SFW320-6/740 320 345.5
500 0.119 496 SFW500-6/850 500 456
600 0.131 650 SFW630-6/990 630 610
700 0.141 823 SFW800-6/990 800 770
CJA237/475-W-90/1*7 260 0.261 572 750 SFW500-8/850 500 526
280 0.271 636 SFW630-8/990 630 585
300 0.28 700 SFW630-8/990 630 651
320 0.289 766 SFW800-8/990 800 712
340 0.298 834 SFW800-8/990 800 775
360 0.307 899 SFW800-8/990 800 836
380 0.315 968 SFW1000-8/1180 1000 900
400 0.327 1093 1000 SFW1000-6/1180 1000 1021.9
420 0.335 1159 SFW1000-6/1180 1000 1189
440 0.343 1287 SFW1250-6/1180 1250 1203.3
460 0.351 1382 SFW1250-6/1180 1250 1292.2
480 0.359 1476 SFW1250-6/1180 1250 1380.1
500 0.366 1567 SFW1600-6/1180 1600 1465.1

Product pictures:

Water Wheel Hydro Generator Hydro Generator Turbine Pelton Easy To Operate
Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website. website address: www.fstgenerator.com

Send your message to this supplier
Send Now

Water Wheel Hydro Generator Hydro Generator Turbine Pelton Easy To Operate

Ask Latest Price
Watch Video
Brand Name :
Forster
Model Number :
CJA237/475-W-90
Certification :
ISO9001/CE/TUV/From-E
Place of Origin :
Sichuan province,in China
MOQ :
1 SET
Price :
Negotiable
Contact Supplier
video
Water Wheel Hydro Generator Hydro Generator Turbine Pelton Easy To Operate
Water Wheel Hydro Generator Hydro Generator Turbine Pelton Easy To Operate
Water Wheel Hydro Generator Hydro Generator Turbine Pelton Easy To Operate

Chengdu Forster Technology Co., Ltd.

Active Member
6 Years
sichuan, chengdu
Since 1956
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
50000000-80000000
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement