Low Head Turbine Power Generator Hydroelectric Wheel Generator
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Hydroelectric wheel Pelton turbine Product features:
Hydroelectric wheel pelton turbine or Pelton wheel is a type of turbine used frequently in hydroelectric plants. These turbines are generally used for sites with heads greater than 300 meters. This type of turbine was created during the gold rush in 1880 by Lester Pelton.
When used for generating electricity, there is usually a water reservoir located at some height above the Pelton turbine. The water then flows through the penstock to specialized nozzles that introduce pressurized water to the turbine. To prevent irregularities in pressure, the penstock is fitted with a surge tank that absorbs sudden fluctuations in water that could alter the pressure.
Unlike other types of turbines which are reaction turbines, the Pelton turbine is known as an impulse turbine. This simply means that instead of moving as a result of a reaction force, water creates some impulse on the turbine to get it to move.
.
1, Power station from water to water direction is basically the axial direction penetration.such as bulb turbine hydropower station of the feed water control and outlet pipe bend, simple shape, the path of circulation of hydraulic damage reduction,convenient construction .
2, Tubular turbine has high flow ability and larger specific speed, so when the head and power are under the same conditions,tubular turbine diameter is about 10% smaller than Turn to paddle
3, Hydro-power unit structure is compact,compared with the same specifications of paddle unit,Its size is small,and it can be decorated in dam body,cancel the complex diversionsystem,reduce the construction area of factory building,reduce the excavated volume and the amount of concrete,according to the relevant data analysis,construction cost can be saved 20%-30%.
4, Hydroelectric wheel work for reversible pump turbine running, due to the in and out of the water without a sharp turn working condition of pump and the turbine can get a better hydraulic performance.Such as tidal power station can be two way with applications in power generation,pumping,drainage and other three kinds of functions.Therefore,it is suitable for comprehensive exploitation and utilization of low head hydraulic resource.
5, Hydro-power is short in construction period, and results fast generally than vertical axial-flow hydro-power station .
Unlike other types of turbines which are reaction turbines, the Pelton turbine is known as an impulse turbine. This simply means that instead of moving as a result of a reaction force, water creates some impulse on the turbine to get it to move.
Automatic pelton turbine product parameters:
Pelton tubine generator unit | Generator | Unit output (kw) | Gevernor or Regulating work | Valve | |||||
Turbine | |||||||||
Type | Water head(m) | Discharge (m³/s) | Output(kw) | Speed (r/min) | Type | Capacity (kw) | |||
CJA237/475-115/1 x 9 | 400 | 0.54 | 1821 | 750 | SFW1600-12/1430 | 1600 | CJW-I BWT-6000 | DN400 | |
420 | 0.56 | 1973 | SFW1600-10/1430 | 1600 | |||||
440 | 0.57 | 2121 | SFW2000-10/1430 | 2000 | |||||
460 | 0.58 | 2267 | SFW2000-10/1430 | 2000 | |||||
480 | 0.59 | 2415 | SFW2000-10/1430 | 2000 | |||||
500 | 0.61 | 2564 | SFW2500-10/1430 | 2500 | |||||
CJA237/475- W-115/1 x 12.5 | 100 | 0.53 | 435 | 375 | SFW400-16/1180 | 400 | 162.9 | CJWT- I BWT-6000 | DN400 |
120 | 0.58 | 578 | SFW500-16/1180 | 500 | 185.8 | ||||
140 | 0.62 | 728 | 428.6 | SFW630-14/1430 | 630 | 209.3 | |||
160 | 0.66 | 888 | SFW800-14/1430 | 800 | 235.1 | ||||
180 | 0.7 | 1047 | SFW1000-14/1430 | 1000 | 260.2 | ||||
200 | 0.74 | 1242 | 500 | SFW1250-12/1730 | 1250 | 287.4 | |||
220 | 0.78 | 1430 | SFW1250-12/1730 | 1250 | 320.1 | ||||
240 | 0.81 | 1619 | SFW1600-12/1730 | 1600 | 345.5 | ||||
260 | 0.85 | 1828 | 600 | SFW1600-10/1730 | 1600 | 456 | |||
280 | 0.88 | 2057 | SFW2500-10/1730 | 2500 | 610 | ||||
300 | 0.91 | 2283 | SFW2500-10/1730 | 2500 | 770 | ||||
CJA237/475-W-125/1 x 9 | 310 | 0.481 | 1250 | 600 | SFW1250-10/1430 | 1250 | 1186.3 | CJWT- I BWT-6000 | DN400 |
340 | 0.504 | 1449 | SFW1250-10/1430 | 1250 | 1366.4 | ||||
370 | 0.526 | 1644 | SFW1600-10/1430 | 1600 | 1561.8 | ||||
400 | 0.547 | 1835 | SFW1600-10/1430 | 1600 | 1743.3 | ||||
430 | 0.567 | 2033 | SFW1600-10/1730 | 1600 | 1933.4 | ||||
460 | 0.586 | 2269 | 750 | SFW2000-8/1730 | 2000 | 2178.2 | |||
490 | 0.605 | 2501 | SFW2500-8/1730 | 2500 | 2401 | ||||
520 | 0.625 | 2748 | SFW2500-8/1730 | 2500 | 2638.1 | ||||
550 | 0.641 | 2981 | SFW2500-8/1730 | 2500 | 2861.8 | ||||
580 | 0.658 | 3219 | SFW3200-8/1730 | 3200 | 3090.2 | ||||
610 | 0.675 | 3413 | SFW3200-8/1730 | 3200 | 3276.2 | ||||
640 | 0.693 | 3652 | SFW3200-8/1730 | 3200 | 3505.9 | ||||
670 | 0.708 | 3918 | SFW4000-8/1730 | 4000 | 3769.1 | ||||
700 | 0.723 | 4170 | SFW4000-8/1730 | 4000 | 4017.6 | ||||
CJA237/475-W-125/1 x 14 | 150 | 0.81 | 993 | SFW1000-14/1430 | 1000 | BWT-6000 | DN500 | ||
170 | 0.86 | 1213 | 428.6 | SFW1250-14/1430 | 1250 | ||||
190 | 0.91 | 1434 | SFW1250-14/1430 | 1250 | |||||
210 | 0.95 | 1652 | SFW1600-12/1730 | 1600 | |||||
230 | 1 | 1909 | SFW1600-12/1730 | 1600 | |||||
250 | 1.04 | 2163 | 500 | SFW2000-12/1730 | 2000 | ||||
270 | 1.08 | 2417 | SFW2000-12/1730 | 2000 | |||||
290 | 1.12 | 2671 | SFW2500-12/1730 | 2500 | |||||
310 | 1.16 | 2970 | SFW2500-12/1730 | 2500 | |||||
330 | 1.19 | 3278 | 600 | SFW3200-10/1730 | 3200 | ||||
350 | 1.23 | 3588 | SFW3200-10/1730 | 3200 |
Hydroelectric wheel pelton turbine product pictures:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website. website address: www.fstgenerator.com