Automatic Voltage Regulator Hydro Electric Water Turbine Generator
The fundamental design principles can now be outlined. It is emphasized that preliminary calculations and reliance on previous parametric studies can only provide an approximate design and do not guarantee high efficiency, so full numerical calculations are recommended in the detailed
design followed by turbine testing.
Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.
The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.
Working Principle
When water flows from the pressure foray into the turbine nozzle through pipe, its potential energy is converted to kinetic energy by the nozzle. The high speed water jet comes out from the nozzle strikes at the buckets (blades) at a certain angle (not in a tangential direction) against the rotating surface of the runner. The water flows into the propeller (turbine runner) from one side and flows out from other side.
In a Turgo, the runner is less expensive to make than a Pelton Wheel and does not need an airtight housing like the Francis. It also has a higher specific speed, handling a greater flow than the Pelton Wheel. This leads to a reduced generator and installation cost. Turgos operate in a head range where the Francis and Pelton overlap.
XJ1 3-W-20/1 * 5 turbine performance data and supporting table | ||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | |||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | The runaway speed | Rated speed(r/min) | |||
Flow rate (m3/s) | The output(kw) | |||||||
XJ1 3-W-20/1 * 5 | 30 | 0.0482 | 10.9 | 1095 | 10 | 1000 | 1800 | Indirect connection |
35 | 0.0521 | 13.4 | 1183 | 10 | 1000 | 1800 | # | |
40 | 0.0556 | 16.2 | 1265 | 15 | 1500 | 2200 | # | |
45 | 0.059 | 19.7 | 1340 | 15 | 1500 | 2200 | # | |
50 | 0.0621 | 23.4 | 1410 | 26 | 1500 | 2200 | Direct connection | |
55 | 0.0652 | 27.4 | 1480 | 26 | 1500 | 2200 | # | |
60 | 0.068 | 31.2 | 1550 | 26 | 1500 | 2200 | # | |
65 | 0.071 | 35.1 | 1610 | 40 | 1500 | 2400 | # | |
70 | 0.0735 | 38.8 | 1670 | 40 | 1500 | 2400 | # | |
75 | 0.076 | 42.5 | 1730 | 40 | 1500 | 2400 | Indirect connection | |
80 | 0.0786 | 48.2 | 1790 | 40 | 1500 | 2400 | ||
85 | 0.081 | 49.3 | 1840 | 55 | 1500 | 2400 | # |
TurgoTurbine Product Pictuers
Forster is strict to IEC international standard and national standard. It has CE,ISO,TUV,certificate. The hydro turbines have different types, specifications and reliable quality with characteristics of reasonable structure, reliable operation, high efficiency, standardized parts ,convenient maintenance.
After obtaining the certification of IS09001 quality management system, we still adhere to the rigorous work style formed in the turbine industry for many years, constantly and independently improve and perfect the management system of the enterprise, cherish and value the rich experience accumulated in the turbine production for decades, and constantly increase the technical force and Equipment input, focusing on the production, manufacture and installation of hydro-generator set equipment, auxiliary equipment of power station, production and manufacture of over-current components, repair and Capacity Upgrading of various power stations.
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com