Specifications
Brand Name :
Forster
Model Number :
GL-T03-40
Certification :
CE/TUV/ISO9001/From-E
Place of Origin :
Sichuan, China (Mainland)
MOQ :
1 Set/Sets
Price :
USD12100-52000/set
Payment Terms :
L/C, T/T, Western Union
Supply Ability :
30set/month
Delivery Time :
90days
Packaging Details :
wooden box
Water Head :
4-16m
Flow Rate :
0.25-1.3m3/s
Application :
Low head area
Frequency :
50Hz/60Hz
Voltage :
220v,380v,400v
Generator type :
Brushless Excitation
Excitation device :
Integrated control panel
Speed control function :
Active guide vane speed
Keyword :
tubular turbine
Description

Hydroelectric Energy Market Low Head Pipe Installation 20kw to160kw Tubular Hydro Turbine For Hydro Power Plant

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series,e.g. vertical type horizontal type.

3. Tubular turbine generators series ,e.g. Bulb type and shaft extension type.

4. Francis turbine generators series.

5. Pelton turbine generators series and double turbine generators series and so on.

6. Other auxiliary equipment for hydropower station, such as generator, control panel, governor, valve, transformer, automatic electrical equipment, electricity meter, pressure tube, etc

Low Head Pipe Installation Tubular Hydro Turbine 20kw To160kw For Hydro Power Plant

Product features:

1, Power station from water to water direction is basically the axial direction penetration.such as bulb turbine hydropower station of the feed water control and outlet pipe bend, simple shape, the path of circulation of hydraulic damage reduction,convenient construction .

2, Tubular turbine has high flow ability and larger specific speed, so when the head and power are under the same conditions,tubular turbine diameter is about 10% smaller than Turn to paddle

3, Hydro-power unit structure is compact,compared with the same specifications of paddle unit,Its size is small,and it can be decorated in dam body,cancel the complex diversionsystem,reduce the construction area of factory building,reduce the excavated volume and the amount of concrete,according to the relevant data analysis,construction cost can be saved 20%-30%.

4, Tubular turbine work for reversible pump turbine running, due to the in and out of the water without a sharp turn working condition of pump and the turbine can get a better hydraulic performance.Such as tidal power station can be two way with applications in power generation,pumping,drainage and other three kinds of functions.Therefore,it is suitable for comprehensive exploitation and utilization of low head hydraulic resource.

5, Hydro-power is short in construction period, and results fast generally than vertical axial-flow hydro-power station .

Product parameters:

T03-40 Hydro tubular turbine performance data and supporting table
Model Turbine Parameters Generator Parameters Driving mode Speed Way Water Intake
Design head(m) Under the design head Design speed (r/min) The power of generator Rated speed(r/min) Vavel control Guide vane control Diameter (mm)
Flow rate (m3/s) The output(kw)
T03-40 4 0.64 21 750 20 750 direct connection 500
4.5 0.68 25 795 25 750
5 0.72 29 839 25 750
5.5 0.75 34 879 30 750
6 0.78 38 919 35 1000
6.5 0.82 43 956 40 1000
7 0.85 48 992 45 1000
7.5 0.88 54 1027 50 1000
8 0.91 59 1061 55 1000
8.5 0.93 65 1093 60 1000
9 0.96 70 1125 70 1000
9.5 0.99 76 1156 75 1000
10 1.01 82 1186 80 1000
10.5 1.04 89 1215 85 1000
11 1.06 95 1244 90 1000
11.5 1.09 102 1272 100 1000
12 1.11 108 1299 105 1000
12.5 1.13 115 1326 110 1500
13 1.15 122 1352 120 1500
13.5 1.18 129 1378 125 1500
14 1.2 136 1403 135 1500
14.5 1.22 144 1428 145 1500
15 1.24 151 1452 150 1500
15.5 1.26 159 1476 155 1500
16 1.28 167 1500 165 1500

Product pictures:

Product drawing:

Other products

Company Information

Our workshop

Advantages

Engineering Case

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4, Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6, How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7, Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website. website address: www.fstgenerator.com

Send your message to this supplier
Send Now

Low Head Pipe Installation Tubular Hydro Turbine 20kw To160kw For Hydro Power Plant

Ask Latest Price
Brand Name :
Forster
Model Number :
GL-T03-40
Certification :
CE/TUV/ISO9001/From-E
Place of Origin :
Sichuan, China (Mainland)
MOQ :
1 Set/Sets
Price :
USD12100-52000/set
Contact Supplier
Low Head Pipe Installation Tubular Hydro Turbine 20kw To160kw For Hydro Power Plant
Low Head Pipe Installation Tubular Hydro Turbine 20kw To160kw For Hydro Power Plant

Chengdu Forster Technology Co., Ltd.

Active Member
6 Years
sichuan, chengdu
Since 1956
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
50000000-80000000
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement