Product features:
Low flow water turbine pelton generator(impact water turbine) is a hydraulic prime mover that converts water energy into mechanical energy by drawing a free jet with kinetic energy by means of a special water guiding mechanism, rushing to the runner water bucket, and rotating the runner to do work. In impact turbines, the relative positions and working times of working jets and runners can be divided into impact turbines, oblique turbines, and double-click turbines.
Pelton turbines use high-speed water to “shock” the runners to do work. The water flow enters the turbine from the pressurized water pipe and forms a high-speed jet through the nozzle.
1. suitable for high head,small flow and flow changes in large runoff hydropower station.
2. With the power plant investment is small,compact units structure characteristics.
3. Has the efficiency changes smoothly,operating a wide range,even in the 15--20% load is reduced efficiency.
4. Suitable for high head,small flow station in mountainous area.
5. A unit construction,simple restrictions without cavitation condition,the advantages of stable operation,less investment,construction area.
Pelton tubine generator unit | Generator | Gevernor or Regulating work | Valve | |||||
Turbine | ||||||||
Type | Water head(m) | Discharge (m³/s) | Output(kw) | Speed (r/min) | Type | Capacity (kw) | ||
CJA475-W-125/2x14 | 137 | 1.541 | 1739 | 375 | SFW1600-16/2600 | 1600 | CJWT- II BWT-6000 | DN800 |
157 | 1.662 | 2151 | SFW2000-16/2600 | 2000 | ||||
183 | 1.783 | 2688 | 428.6 | SFW2500-14/2600 | 2500 | |||
214 | 1.941 | 3422 | SFW3200-14/2600 | 3200 | ||||
248 | 2.082 | 4255 | 500 | SFW4000-12/2600 | 4000 | CJWT- II BWT-10000 | ||
287 | 2.237 | 5291 | SFW5000-12/2600 | 5000 | ||||
CJA475-W-140/2x14 | 116 | 1.429 | 1366 | 300 | SFW1250-20/2600 | 1250 | CJWT- II BWT-6000 | DN800 |
137 | 1.541 | 1739 | 333.3 | SFW1600-18/2600 SFW2000-18/2600 | 1600 | |||
157 | 1.662 | 2151 | 2000 | |||||
183 | 1.783 | 2688 | 375 | SFW2500-16/2600 | 2500 | |||
214 | 1.941 | 3422 | 428.6 | SFW3200-14/2600 | 3200 | |||
248 | 2.082 | 4255 | SFW4000-14/2600 | 4000 | CJWT- II BWT-10000 | |||
287 | 2.237 | 5291 | 500 | SFW5000-12/2600 | 5000 | |||
333 | 2.417 | 6632 | SFW6300-12/2600 | 6300 | ||||
400 | 2.495 | 8421 | 600 | SFW8000-10/2600 | 8000 | |||
CJA475-W-140 /2x16 | 114 | 1.851 | 1739 | 300 | SFW1600-20/2600 | 1600 | CJWT- II BWT-6000 | |
132 | 1.977 | 2151 | SFW2000-20/2600 | 2000 | ||||
153 | 2.132 | 2688 | 333.3 | SFW2500-18/2600 | 2500 | |||
179 | 2.32 | 3422 | 375 | SFW3200-16/2600 | 3200 | CJWT- II BWT-10000 | DN 1000 | |
207 | 2.495 | 4255 | SFW4000-16/2600 | 4000 | ||||
240 | 2.675 | 5291 | 428.6 | SFW5000-14/2600 | 5000 | |||
279 | 2.884 | 6632 | 500 | SFW6300-12/2600 | 6300 |
Product pictures:
Installation picture:
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4, Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, How many an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6, How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7, Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com