Specifications
Brand Name :
Forster
Model Number :
HL240C-WJ-50
Certification :
ISO9001/CE/TUV/From-E
Place of Origin :
Sichuan
MOQ :
1
Price :
Negotiable
Payment Terms :
L/C, D/A, D/P, T/T, Western Union
Supply Ability :
20set/Month
Delivery Time :
120-180days
Packaging Details :
wood box
Water head :
13m-40m
Flow rate :
1.43-12.34m3/s
Speed :
250-1000rpm/min
Power :
100kw-3.6mw
Efficiency :
86%-90%
Generator :
brushless excitation
Valve :
Butterfly valve /Gate valve
Gevernor :
YT-3000
Keyword :
francis turbine
Description

Automated Control Of Complete Equipment Water Head 15 To 40m Francis Turbine Generator For Hydroelectric Power Plant

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

The Francis hydri turbine generator unit is one of our common turbines. It consists of a turbine, a generator and so on.
Most of the turbines are installed in hydropower stations to drive generators to generate electricity. In the hydropower station, the water in the upstream reservoir is led to the turbine through the water conduit, pushing the turbine runner to rotate and driving the generator to generate electricity. The finished water is drained downstream through the tailpipe. The higher the head and the greater the flow, the greater the output power of the turbine.


The recent development trend of Francis turbines is high head, large capacity, high efficiency, and its head adapts to medium and high heads and is used by more hydropower stations. It is currently widely used in the world.

Francis turbine is one of the most widely used turbines. It has a compact structure, reliable operation and high efficiency range, usually from 85%-95%, and it can be used at different ranges of water flow. Our Francis turbines are commonly used at hydraulic head range of 20-700 meters.

Its special hydraulic characteristics are suitable for high-speed and high-power units.

1,suitable for high head,small flow and flow changes in large runoff hydropower station;

2.With the power plant investment is small,compact units structure characteristics;

3.Has the efficiency changes smoothly,operating a wide range,even in the 15%-20%load is reduced efficiency;

4.Suitable for high head amall flow station in mountain area;

5.A unit construction,simple restrictions without cavitation condition,the advantages of stable ooperation,less investment,construction area.

Product parameters:

HL-WJ-Francis tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Speed (r/min) Power(kw) Efficiency(%)
HL240C-WJ-50 15 1.43 600 183 86.9 SFW160-10/740 YT-3000 Z941H-6Dg800
17 1.53 600 219.6 86.2 SFW200-10/740
20 1.64 750 280.9 87.1 SFW250-8/740
23 1.77 750 348.3 87 SFW320-8/850
27 1.92 750 438.4 86.1 SFW400-8/850
30 2.03 750 509.9 85.5 SFW500-8/850
36 2.21 1000 680.6 87.2 SFW630-8/990
40 2.34 1000 799.8 87.1 SFW800-6/1180
HL240C-WJ-60 13 1.91 500 213.4 87.7 SFW200-12/850 YT-3000 PDF6-WDDg1000
15 2.06 500 265.7 87.5 SFW250-12/850
18 2.25 600 349 87.5 SFW320-10/990
21 2.43 600 438.6 87.8 SFW400-10/990
24 2.61 600 534 86.9 SFW500-10/990
28 2.8 750 673 87.5 SFW630-8/990 YT-6000
32 2.99 750 816.6 86.9 SFW800-8/990
37 3.24 750 1023.4 87 SFW1000-8/990
40 3.37 750 1143.8 86.5 SFW1000-8/990
HL240C-WJ-71 18 3.14 500 489.6 88.2 SFW500-12/990 YT-3000 PDF6-WDDg1200
22 3.5 500 658.6 87.2 SFW630-12/1180
26 3.78 600 850 88.2 SFW800-10/1180
30 4.06 600 1051.1 88 SFW1000-10/1430
34 4.35 600 1268.1 87.3 SFW1250-10/1430
38 4.6 600 1498.4 87.4 SFW1600-10/1430
HL240C-WJ-84 17 4.3 375 634 88.3 SFW630-16/1430 YT-6000 PDF6-WDDg1250
20 4.67 375 799.9 87.3 SFW800-16/1430
24 5.12 428.6 1058.8 87.9 SFW1000-14/143 YT-10000
28 5.49 500 1338.7 88.8 SFW1250-12/1430
32 5.91 500 1631.9 88 SFW1600-12/1730 YT-18000
37 6.35 500 2005.9 87 SFW2000-12/1730
HL240C-L(W)J-100 20 6.48 300 1106.9 87 SF1000-20/2150 YT-10000 Or YWT-10000 YWT18000 PDF6-WYDg1250
25 7.4 375 1608 88.6 SF1600-16/2600
30 8.1 375 2070.7 86.8 SF2000-16/2600
34 8.63 428.6 2544 88.4 SF2500-14/2600
38 9.06 500 3016.6 89.3 SF3200-12/2600
HL240C-LJ-120 18 9.04 250 1389 87 SF1250-24/2600 YT18000 YWT18000 PDF60-WYDg175
22 9.93 300 1907.1 89 SF2000-20/2600
25.5 10.76 300 2369.1 88 SF2000-20/2600
29.5 11.58 333.3 2961.3 88.4 SF2500-18/2600 YT30000 YWT-30000
33.5 12.34 375 3607.9 89 SF3200-16/2600


Product pictures:

Company Information

Our Workshop:

Advantages:

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

Q8,We need to do civil construction in advance, etc. Can your company provide installation layout drawings for hydropower stations?
Of course, we will provide you with installation layout drawings within 2 weeks of receiving the deposit. If necessary, we will try our best to cooperate with the previous civil works.

Send your message to this supplier
Send Now

Water Head 15 To 40m Hydro Turbine Generator For Hydropower Stations

Ask Latest Price
Brand Name :
Forster
Model Number :
HL240C-WJ-50
Certification :
ISO9001/CE/TUV/From-E
Place of Origin :
Sichuan
MOQ :
1
Price :
Negotiable
Contact Supplier
Water Head 15 To 40m Hydro Turbine Generator For Hydropower Stations
Water Head 15 To 40m Hydro Turbine Generator For Hydropower Stations
Water Head 15 To 40m Hydro Turbine Generator For Hydropower Stations

Chengdu Forster Technology Co., Ltd.

Active Member
6 Years
sichuan, chengdu
Since 1956
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
50000000-80000000
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement