Specifications
Brand Name :
Forster
Model Number :
SZWT-300
Certification :
CE/TUV/ISO9001/From-E
Place of Origin :
Sichuan, China (Mainland)
MOQ :
1set
Price :
Negotiable
Payment Terms :
L/C, T/T
Supply Ability :
30set/month
Delivery Time :
90days
Packaging Details :
wood box
Function 1 :
Active power regulation
Function 2 :
Fast automatic synchronization
Function 3 :
Detection of electrical fault
Function 4 :
Increase or decrease load and load operation
Function 5 :
Guide vane opening
Function 6 :
Adopt PID intelligent control
Keyword :
Hydro Turbnine Governor
Function 7 :
Rated oil pressure 2.5-4.0mpa
Description

SZWT Digital Valve Microcomputer Water Turbine Governor Compatible With Hydropower Equipment For HPP

Main Products:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

As an important part of the turbine, the turbine governor is extremely complex and directly affects the operation of the turbine. Hydropower
Turbine governor.


In the operation of the station, in order to ensure the normal operation of the turbine, it is necessary to ensure that the functions of the turbine governor can function normally. Based on this, when using the turbine, the turbine governor should be commissioned to support the normal and stable operation of the turbine. In order to ensure the commissioning effect of the turbine governor, the relevant staff should have a certain understanding of the working principle of the turbine governor, and must master the corresponding debugging techniques, methods and processes, preferably with certain turbine governor debugging experience. In order to better carry out the commissioning of the turbine governor.
Commissioning of the turbine governor can be done in two steps, namely experimentation and testing. When commissioning the turbine governor, the relevant personnel should first perform static and dynamic experiments on the turbine to detect all aspects of the turbine governor during use, thereby regulating the turbine. The normal use of the device provides protection.

1. measure the frequency of the unit and the power grid, and realize the frequency regulation of the unit when it is running without load or in isolation;

2. when no load is on, the unit frequency automatically tracks the power grid frequency, which is convenient for rapid automatic synchronization;

3. manually start and stop, increase and decrease load, and operate with load;

4. automatically start and stop the machine, and automatically adjust unit output according to permanent slip (bp) after grid connection;

5. switch automatically and manually unconditionally and without disturbance;

6. main parameters and operation status of speed regulators such as machine frequency, network frequency, guide blade opening, manual and automatic are displayed on the display screen;

7. able to set the operating parameters of the governor through the display screen;

8. when an electrical fault is detected, it can be automatically cut to manual and the load can be fixed in the state before the fault.

9. high reliability programmable controller (PLC), small size, strong anti-interference ability, and an average trouble-free time of more than 300,000 hours;

10. software frequency measurement can meet the requirements of timing and accuracy of frequency measurement;

11. PID intelligent control, with good stability and adjustment quality

Product pictures:

SZWT Digital Governor Hydro Turbine Compatible With Hydropower Equipment

Company Information:

Our workshop

Advantages:

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com

Send your message to this supplier
Send Now

SZWT Digital Governor Hydro Turbine Compatible With Hydropower Equipment

Ask Latest Price
Brand Name :
Forster
Model Number :
SZWT-300
Certification :
CE/TUV/ISO9001/From-E
Place of Origin :
Sichuan, China (Mainland)
MOQ :
1set
Price :
Negotiable
Contact Supplier
SZWT Digital Governor Hydro Turbine Compatible With Hydropower Equipment
SZWT Digital Governor Hydro Turbine Compatible With Hydropower Equipment

Chengdu Forster Technology Co., Ltd.

Active Member
6 Years
sichuan, chengdu
Since 1956
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
50000000-80000000
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement