Specifications
Brand Name :
Forster
Model Number :
HL260C-LJ-140
Certification :
CE/TUV/ISO9001
Place of Origin :
Sichuan, China (Mainland)
MOQ :
1 Set/Sets
Price :
Negotiable
Payment Terms :
L/C, T/T
Supply Ability :
30 Set/Sets per Month
Delivery Time :
160days
Packaging Details :
wood box
Design head :
12.2-29.4m
Design flow :
10.25-26.37m3/s
Pipe diameter :
DN2250-2750mm
Generator :
brushless excitation
Processing method :
CNC machining / constant temperature annealing
Valve :
Gate valve
Installation method :
horizontal installation / vertical installation
Backup power :
charger and rechargeable battery
Generator phase number :
3 phase
Governor :
Microcomputer Governor
Voltage :
6300v,10kv,11kv,20kv,33kv,35kv
Power :
1.1mw-6.7mw
Description

Suitable For High Oil Pressure Governors In Large Dams Hydro Francis Turbine Generator Unit For Hpp

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features :

Hydroelectric power is the use of hydraulic power (with water head) to propel the hydraulic machinery (turbine) to turn the potential energy of the water into mechanical energy. If another machine is connected to the turbine (power generation)
The machine emits electricity as the turbine rotates, at which point the mechanical energy is converted into electrical energy. In a sense, hydropower is a process in which the potential energy of water becomes mechanical energy and becomes electrical energy.
A comprehensive engineering facility that converts water energy into electrical energy. Also known as hydropower plants. It includes a series of hydropower station buildings and installed hydropower station equipment for the production of electrical energy using water energy. Using the drop of the natural water flow concentrated in these buildings to form the water head, collecting and regulating the flow of the natural water flow, and transferring it to the water turbine, through the joint operation of the water turbine and the generator, converting the concentrated water energy into electric energy, and then passing through the transformer and the switch. Stations and transmission lines, etc., input electrical energy into the grid. In addition to the buildings required for power generation, some hydropower stations often have other buildings that serve the purposes of flood control, irrigation, shipping, over-wooding, and overfishing. The complex of these buildings is called a hydropower hub or water conservancy hub.

Product parameters:

HL-WJ-Francis tubine generator unit Generator Gevernor or Regulating work Valve
Turbine
Type Water head(m) Discharge (m³/s) Speed (r/min) Power(kw) Efficiency(%)
HL160/
D46-
WJ-84
59.6 3.26 600 1720 90.2 SFW1600-10 YWT-10000
YWT-18000
PDF10-WDDg1000 PDF16-WDDg1000
70.1 3.53 750 2150 88.7 SFW2000-8
82 3.68 2680 90.5 SFW2500-8
96 4 3410 90.5 SFW3200-8
113 4.03 4260 89.5 SFW4000-8
131 4.68 5320 88.5 SFW5000-8
HL160/
D46-
LJ-100
62.9 4.82 600 2623 88.2 SF2500-10 YWT-18000
YWT-30000
PDF10(16)-WYDg1250
72.6 5.23 3358 90.1 SF3200-10
87 5.6 4298 90 SF4000-10
102 6.06 5396 89 SF5000-10
117 6.48 750 6778 91 SF6300-8
136 6.99 8494 91 SF8000-8
HL160/
D46-
LJ-120
68 7.36 500 4370 89 SF4000-12 YWT-18000
YWT-30000
PDF16-WYDg1500
80 7.84 600 5380 87.4 SF5000-10
90.5 8.4 6700 89.9 SF6300-10
104 9.09 8510 91.8 SF8000-10
120.5 9.7 10530 91.8 SF10000-10
HL160/
D46-
LJ-140
75 9.61 428.6 6528 92.3 SF6300-14 YWT-30000 PDF16(25)-WYDg1500
88 10.48 500 8291 91.7 SF8000-12 SF10000-12 YWT-38000
101.5 11.22 10330 92.5
119.6 11.94 12913 92.2 SF12500-12
133.2 12.85 600 15496 92.3 SF15000-10 YWT-50000
161 14.18 20661 92.3 SF20000-10 YWT-54000
HL160/
D46-
LJ-160
86 13.26 375 10330 92.4 SF10000-16 YWT-50000 PDF16(25)-WYDg1750
99 14.35 12913 92.7 SF12500-14
113 15.15 428.6 15496 92.3 SF15000-14 YWT-51000
134.5 16.9 500 20661 92.7 SF20000-12 YWT-62000
156.6 18.26 600 25826 92.1 SF25000-12 YWT-73000
177 19.3 30992 92.5 SF30000-10 YWT-82000
HL160/
D46-LJ
-180
95.5 17.87 375 15496 92.6 SF15000-16 YWT-59000 PDF16(25)-WYDg2000
115 19.78 428.6 20662 92.6 SF20000-14 YWT-72000
133.6 21.26 25827 92.7 SF25000-14 YWT-83000
150.3 22.85 30992 92 SF30000-14 YWT-94000
167 23.81 500 36157 92.7 SF35000-12 YWT-104000
184 24.75 41322 92.5 SF40000-12 YWT-113000

Product pictuers:

1.1mw-6.7mw Water Flow Turbine Generator For High Oil Pressure Governors In Large Dams1.1mw-6.7mw Water Flow Turbine Generator For High Oil Pressure Governors In Large Dams1.1mw-6.7mw Water Flow Turbine Generator For High Oil Pressure Governors In Large Dams

Installation design drawings:

1.1mw-6.7mw Water Flow Turbine Generator For High Oil Pressure Governors In Large Dams

Company Information:

Our Workshop:

Advantages:

Packaging & Shipping:

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does the runner of Francis turbine produce negative pressure during operation? If the negative pressure will be generated, where will the negative pressure be generated, and how much range should we choose the measuring instrument?

When the turbine is in an operating state of no-load, low head, small load, high head, and overload and large flow, it will cause the dynamic load caused by pressure pulsation and hydraulic disturbance.

Since the Francis turbine is a fixed-blade hydraulic machine, when the turbine runs away from the optimal working condition, a large vacuum is generated in the area near the axis of the draft tube due to the rotating circumferential velocity of the runner outlet water flow.

The pulsation produces instantaneous negative pressure, the vacuum is not high, and it is not suitable for measurement due to its generation in the casing. Vibration, audio and other alternative measuring methods can be considered.

Due to the uneven gap between the rotating part and the fixed part of the turbine, the center of the wheel is deviated from the center of the unit. The gap between the fixed and rotating labyrinth rings of the wheel is constantly changing with the rotation of the wheel, and the water pressure in the gap changes accordingly.

When the flow of water flowing into the runner loses its axisymmetricity, an unbalanced lateral force occurs and pressure pulsations also occur.

Q8,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website:www.fstgenerator.com

Send your message to this supplier
Send Now

1.1mw-6.7mw Water Flow Turbine Generator For High Oil Pressure Governors In Large Dams

Ask Latest Price
Brand Name :
Forster
Model Number :
HL260C-LJ-140
Certification :
CE/TUV/ISO9001
Place of Origin :
Sichuan, China (Mainland)
MOQ :
1 Set/Sets
Price :
Negotiable
Contact Supplier
1.1mw-6.7mw Water Flow Turbine Generator For High Oil Pressure Governors In Large Dams
1.1mw-6.7mw Water Flow Turbine Generator For High Oil Pressure Governors In Large Dams

Chengdu Forster Technology Co., Ltd.

Active Member
6 Years
sichuan, chengdu
Since 1956
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
50000000-80000000
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement