Specifications
Place of Origin :
Sichuan, China (Mainland)
Brand Name :
Forster
Model Number :
XJ02-W-40/1*11
Supply Ability :
30 Set/Sets per Month
Packaging Details :
Wood Box
MOQ :
1 Set/Sets
Price :
Negotiable
Certification :
CE/TUV/ISO9001/From-E
Payment Terms :
L/C, T/T
Delivery Time :
120days
Designer head :
35 - 95 m
Traffic :
0.208 - 0.343 m3 / s
The output :
55.1 - 246.5kw
The power of generator :
55 - 200 kw
Rated speed :
600 - 1000 r / min
Driving mode :
Straight league,Between the united
Diameter :
300 mm
Keyword :
Hydroelectric turbine
Material :
Stainless steel
Port :
Shanghai / Shenzhen
Description

High Pressure Governor Butterfly Valve Automatic Control 200kw Micro Hydro Electric Turgo Turbine Generator For Hpp

Our main products included:

1. Kaplan turbine generators series.

2. Turgo turbine generators series.

3. Tubular turbine generators series.

4. Francis turbine generators series.

5. Pelton turbine generators series.

Product features:

Turgo turbine mainly composed of a nozzle and a runner. The runner consists of an outer rim, An inner hub and a number of single bowl - shaped buckets fixed by the question. The nozzle jet ramps the blade on the front side of the wheel at an Angle of 22.5 ° and then flows out from the back. The Structure is simple, the cost is low, but the efficiency is low. Only for small power stations. Applicable head is 20~100 m, even higher.

However, Pelton turbine is more commonly used with high head, because Pelton turbine has higher efficiency and wider range of head than Turgo turbine. However, the price of Turgo turbine is more economical than that of Pelton turbine. This is mainly based on the actual situation of the customer, and then our engineers choose the design.

1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.

2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.

Product features:

XJ02-W-40/1 x 11 turbine performance data and supporting table
Model Turbine Parameters Generator Parameters Driving mode Speed Way Water Intake
Design head(m) Under the design head Design speed (r/min) The power of generator The runaway speed Rated speed(r/min) manually automatic Model dianeter
Flow rate (m3/s) The output(kw)
XJ02-W-40/1 x 11 35 0.208 55.1 592 55 600 1320 Direct connection manually YTT- Z41 H- 300
40 0.223 67.6 632 55 600 1320 # # # # #
45 0.236 79.5 371 75 600 1320 # # # # #
50 0.249 93.4 707 75 750 1650 # # # # #
55 0.261 108.9 741 100 750 1650 # # # # #
60 0.273 124.5 775 100 750 1650 # # # # #
65 0.284 139.4 806 125 750 1650 # # # # #
70 0.295 154.6 837 125 750 1650 # # # # #
75 0.305 169.2 866 160 750 1350 # # # # #
80 0.315 185.9 894 160 1000 2200 # # # # #
85 0.325 206 922 200 1000 1800 # # # # #
90 0.334 225.6 949 200 1000 1800 # # # # #
95 0.343 246.5 975 200 1000 1800 # # # # #

Product pictuers:

75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output

Company Information

Our workshop

Advantages

Packaging & Shipping

FAQ

Q1, Which turbine should I choose?

Please tell me the water head, flow rate, frequency, Total power you need

, voltage, on grid or off grid operation, we will propose a solution.

Q2, Can your factory provide all the equipment for hydropower generation?

Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.

Q3, Can you do EPC for a hydroelectric power plant?

Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.

Q4,Is your company a trading company or a manufacturer?

We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.

Q5, What is an acceptable MOQ?

For this product, our acceptable MOQ is 1 set.

Q6,How long is the delivery time?

Delivery times range from 15 days to 6 months depending on the model you are purchasing.

Q7,Does your company have its own independent official website?

Of course, and we can see more information about our company and products on our official website.

website address: www.fstgenerator.com


Send your message to this supplier
Send Now

75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output

Ask Latest Price
Place of Origin :
Sichuan, China (Mainland)
Brand Name :
Forster
Model Number :
XJ02-W-40/1*11
Supply Ability :
30 Set/Sets per Month
Packaging Details :
Wood Box
MOQ :
1 Set/Sets
Contact Supplier
75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output
75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output
75kw Dual Wheel Dual Jet Hydroelectric Turbine Generator 55.1 - 246.5kw Output

Chengdu Forster Technology Co., Ltd.

Active Member
6 Years
sichuan, chengdu
Since 1956
Business Type :
Manufacturer, Exporter, Seller
Total Annual :
50000000-80000000
Employee Number :
100~120
Certification Level :
Active Member
Contact Supplier
Submit Requirement