Easy To Install And Easy To Install Stainless Steel Runner Metal Volute Inclined Hydro Turbine Generator For Sale
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
When the slanting turbine is working, the water flows from the pressure water pipe through the nozzle to form a high-speed jet, and the jet and the runner plane impact the rotor blade in a 22.5° direction. After the work is done, the Water flows out from the water outlet of the vanes and drains along the tail water channel to the downstream.
In order to ensure free flow of the jet, the turbine runner must be installed above the water level of the tailrace, and the runner should be no less than 0.5m from the water level of the tailrace.
Water energy is converted into mechanical energy
The operating parameters describing the turbine are head (H meters), the operating parameters describing the turbine are head (H meters), the parameters describing the water energy are head (H meters) and flow rate (Q meters 3 / sec). Flow rate (Q meters 3 / sec), power (N kW), speed (n rev / min) and efficiency (η%).
The water flow hits the vane, and the vane changes the direction of the water flow, that is, the force of the vane feed water. According to the law of action reaction, the water flow gives a reaction force to the vane. The vanes to rotate around the axis, which drives the generator or other processing machinery. This is the process by which water can be converted into mechanical energy.
1. Horizontal unit has the advantages of simple structure,convenient repair,reduce the plant height,advantages in reducing excavation depth.
2. The vertical unit with plant plane size small,a runner can be provided with a plurality of nozzles,(at most can be installed six nozzles),high specific speed,the same size as units of capacity is relatively small,light weight and so on.
XJ02-W-50/1 x 11 turbine performance data and supporting table | ||||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | Water Intake | |||||||
Design head(m) | Under the design head | Design speed (r/min) | The power of generator | The runaway speed | Rated speed(r/min) | manually | automatic | Model | dianeter | |||
Flow rate (m3/s) | The output(kw) | |||||||||||
XJ02-W-50/1 x 11 | 45 | 0.271 | 96.7 | 537 | 75 | 600 | 1080 | direct connection | manually | YTT-35 | Z4.H-1.6C | 350 |
50 | 0.286 | 113.2 | 566 | 100 | 600 | 1080 | // | // | " | 〆/ | " | |
55 | 0.296 | 130.6 | 593 | 125 | 600 | 1080 | // | // | // | // | // | |
60 | 0.313 | 148.9 | 620 | 125 | 600 | 1080 | // | // | // | // | // | |
65 | 0.326 | 167.9 | 645 | 160 | 600 | 1080 | // | // | // | // | // | |
70 | 0.338 | 187.6 | 669 | 160 | 600 | 1080 | // | // | // | // | // | |
75 | 0.35 | 208.1 | 693 | 200 | 600 | 1080 | // | // | // | // | // | |
80 | 0.361 | 229.2 | 716 | 200 | 600 | 1080 | // | // | // | // | // | |
85 | 0.372 | 251.1 | 738 | 250 | 750 | 1350 | // | // | // | // | // | |
90 | 0.383 | 273.5 | 759 | 250 | 750 | 1350 | // | // | // | // | // | |
95 | 0.394 | 296.6 | 780 | 250 | 750 | 1350 | // | // | // | // | // | |
100 | 0.404 | 320.4 | 800 | 320 | 750 | 1350 | // | // | // | // | // | |
110 | 0.424 | 269.6 | 839 | 320 | 750 | 1350 | // | // | // | // | // | |
120 | 0.443 | 421.2 | 876 | 400 | 750 | 1350 | // | // | // | // | // |
Product pictuers:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website address: www.fstgenerator.com