High Efficiency Low Head Long Service Life Low Head Water Turbine Generator For Mhpp
Our main products included:
1. Kaplan turbine generators series.
2. Turgo turbine generators series.
3. Tubular turbine generators series.
4. Francis turbine generators series.
5. Pelton turbine generators series.
Product features:
Under the same water head, its overcurrent capacity is larger than that of Francis, and its cavitation erosion performance is worse than that of Francis. According to whether the runner blade can rotate in operation, it can be divided into two types: axial flow propeller type and axial flow fixed propeller type.
The blade of axial-flow fixed-blade turbine is fixed on the runner body, and the blade placement Angle cannot be changed in operation. The efficiency curve is steep, which is suitable for the power station where the load changes little or the number of units can be adjusted to adapt to the load changes. Advantages: simple structure, low cost. Disadvantages: the efficiency will drop sharply when deviating from the design condition. According to its characteristics, it is generally used for hydropower stations with small output, low head and small head change range
Product parameters:
ZD760-LM-80 Hydro Kaplan Tubine Performance Data And Supporting Table | ||||||||||||
Model | Turbine Parameters | Generator Parameters | Driving mode | Speed Way | ||||||||
Design head(m) | Under the design head | Design speed (r/min) | Model | power (kw) | Rated voltage (v) | Rated electric current (A) | Rated speed (r/min) | The run way speed (r/min) | Manually | |||
Flow rate (m3/s) | The output(kw) | |||||||||||
ZD760-LM-80 = 4-5° | 2.2 | 1.76 | 33.5 | 334 | SF26-6/423 | 26 | 400 | 46.9 | 1000 | 2000 | Belt | TT-750 |
2.9 | 2.02 | 50.5 | 382 | SF40-6/423 | 40 | 400 | 72.2 | 1000 | 2000 | Belt | TT-750 | |
3.6 | 2.25 | 70.1 | 429 | SF55-6/493 | 55 | 400 | 99 | 1000 | 2000 | Belt | TT-750 | |
4.3 | 2.46 | 91.5 | 466 | SF75-6/493 | 75 | 400 | 136 | 1000 | 2000 | Belt | TT-750 | |
5 | 2.65 | 114.8 | 503 | SF100-12/850 | 100 | 400 | 181 | 500 | 1000 | Straight league | TT-750 | |
5.2 | 2.67 | 120 | 500 | SF100-8/590 | 100 | 400 | 181 | 750 | 1500 | Belt | TT-750 | |
6 | 2.74 | 142 | 500 | SF125-12/850 | 125 | 400 | 226 | 500 | 1000 | Straight league | TT-750 | |
ZD760-LM-80 = + 1 0° | 2.1 | 1.94 | 34.2 | 334 | SF26-6/423 | 26 | 400 | 46.9 | 1000 | 2000 | Belt | TT-750 |
2.6 | 2.16 | 47.1 | 382 | SF40-6/423 | 40 | 400 | 72.2 | 1000 | 2000 | Belt | TT-750 | |
2.7 | 2.19 | 49.7 | 429 | SF40-6/493 | 40 | 400 | 72.2 | 1000 | 2000 | Belt | TT-750 | |
3.3 | 2.44 | 67.7 | 466 | SF75-6/493 | 75 | 400 | 136 | 1000 | 2000 | Belt | TT-750 | |
4.3 | 2.68 | 90 | 503 | SF75-6/493 | 75 | 400 | 136 | 1000 | 2000 | Belt | TT-750 | |
5 | 3 | 126 | 500 | SF100-6/590 | 100 | 400 | 181 | 1000 | 2000 | Gear | TT-750 | |
5.5 | 3.13 | 144.7 | 500 | SF125-12/850 | 125 | 400 | 226 | 500 | 1000 | Straight league | TT-750 | |
ZD760-LM-80 = + 1 5° | 2 | 2.1 | 34.2 | 301 | SF26-6/423 | 26 | 400 | 46.9 | 1000 | 2000 | Belt | TT-1500 |
2.6 | 2.37 | 50.2 | 340 | SF40-6/423 | 40 | 400 | 72.2 | 1000 | 2000 | Belt | TT-1500 | |
3.2 | 2.65 | 69.1 | 380 | SF55-6/493 | 55 | 400 | 99 | 1000 | 2000 | Belt | TT-1500 | |
3.9 | 2.92 | 92.8 | 429 | SF75-6/493 | 75 | 400 | 136 | 1000 | 2000 | Belt | TT-1500 | |
4.8 | 3.06 | 120.1 | 429 | SF100-6/590 | 100 | 400 | 181 | 1000 | 2000 | Gear | TT-1500 | |
5.4 | 3.13 | 141.2 | 500 | SF125-12/850 | 125 | 400 | 226 | 500 | 1000 | Straight league | TT-1500 | |
6 | 3.54 | 174 | 500 | SF160-12/850 | 160 | 400 | 288 | 500 | 1000 | Straight league | TT-1500 |
Product pictuers:
Design schematic:
Q1, Which turbine should I choose?
Please tell me the water head, flow rate, frequency, Total power you need
, voltage, on grid or off grid operation, we will propose a solution.
Q2, Can your factory provide all the equipment for hydropower generation?
Yes, we can provide you with turbines, hydro-generators, pressure regulators, turbine wheels, control panels, transformers, monitoring systems and more.
Q3, Can you do EPC for a hydroelectric power plant?
Yes, we can provide TURN-KEY and EPC services including measurement, design, manufacturing, construction, manufacturing, commissioning, inspection, maintenance runner replacement and refurbishment/upgrade/improvement/repair/refurbishment of turbines/generators including bearings, seals For parts and key parts, we will send technicians and workers to install equipment.
Q4,Is your company a trading company or a manufacturer?
We are a manufacturer of hydro turbine generators and started to promote the international market in 2013. Our factory is located in Sichuan, where China's water conservancy and hydropower is most developed. Welcome to visit our factory in China.
Q5, What is an acceptable MOQ?
For this product, our acceptable MOQ is 1 set.
Q6,How long is the delivery time?
Delivery times range from 15 days to 6 months depending on the model you are purchasing.
Q7,Does your company have its own independent official website?
Of course, and we can see more information about our company and products on our official website.
website:www.fstgenerator.com