Horizontal Gas Oil Fired 2 Tons 2000kg 150hp Industrial Steam Boilers For Tomato Paste Processing Machine
Model:WNS Series Oil Gas Steam Boiler
Structure:Wet Back Fire Tube Packaged Three Pass
Fuel:oil, gas, light oil, heavy oil, natural gas, lpg, lng, cng, diesel, biogas etc
Capacity:1-20 ton per hour
Pressure:0.7/1.0/1.25/1.6 Mpa (7/10/12.5/16 Bar)
Temperature:170/184/194/204 Celsius
Application:Chemical, food and brewery, pharmaceutical, package plant, textile dyeing and printing industry, swimming pool, hospital,school,clothing industry etc.
WNS type automatic horizontal steam boiler is a horizontal quick - mounted internal - burning three - return - trip fire tube boiler.The bifurcated flue gas is used to wash the second and third return flue gas pipes successively, and then the flue gas chamber is discharged into the atmosphere through the chimney.The boiler is fitted with movable front and rear smoke box covers to facilitate boiler maintenance.
Boiler Features:
1. The design, production, supervision and inspection of boilers are strictly in accordance with the Safety Supervision Regulations for Steam Boilers, JB/T 10094-2002 General Technical Conditions for Industrial Boilers, and JB/T 1619-2002 Technical Conditions for Boiler Body Manufacturing, so as to ensure long-term safety and stability of boilers.
2, the body for the pot shell type full wet back downstream three return firework tube structure, the flame in the large combustion chamber micro positive pressure combustion, complete extension, low burning heat load, less NOx emission of harmful substances.
3, corrugated furnace and threaded pipe structure, that is, to improve the strength, but also to meet the needs of the heat expansion of each part.
4. Butt joint is adopted in the welding of the main welding seam, and non-destructive inspection is conducted by X-ray and ultrasonic to ensure that the welding quality meets the national requirements.
5, the boiler water volume and gas space is large, strong capacity to adapt to the load.Reasonable design of boiler installation, to ensure that the steam water rate is less than 4%, to meet the higher requirements of users on the quality of steam.
6, the use of new heat insulation material, light weight, less heat loss, good insulation performance.
7. The water level alarm adopts stainless steel as electrode rod and teflon as insulation material.Inserted from the top, not easy to hang dirt, reliable performance, long service life.
8. The front and rear smoke boxes are connected by hinges, which can be easily opened, convenient for maintenance and maintenance.
Technical Parameter
Boiler Model | WNS0.5 | WNS1 | WNS2 | WNS3 | WNS4 | WNS6 | WNS8 | WNS10 | WNS15 | WNS20 | |
Rated steam capacity(T/H) | 0.5 | 1 | 2 | 3 | 4 | 6 | 8 | 10 | 15 | 20 | |
Rated steam pressure(Mpa) | 1.0/1.25/1.6/2.5 | ||||||||||
Rated steam temperature(℃) | 184/194/204/226 | ||||||||||
Feed water temperature(℃) | 20/104 | ||||||||||
Thermal efficiency(%) | >98 | ||||||||||
Nox emission(mg/m3) | 120/80/30 | ||||||||||
Exhaust gas temperature(℃) | <60 | ||||||||||
Fuel type | Light diesel oil/Heavy oil/Natural gas/Liquefied gas/City gas | ||||||||||
Fuel consumption | Light diesel oil(kg/h) | 32.5 | 64.6 | 129.3 | 192.9 | 258.2 | 388.6 | 514.6 | 641.7 | 960.1 | 1276.2 |
Natural gas(Nm3/h) | 35.7 | 70.1 | 140.3 | 212.1 | 283.4 | 424.2 | 566.3 | 707.8 | 1061.7 | 1415.8 | |
Max transportation weight(t) | 3.5 | 5.5 | 8.0 | 10.7 | 11.6 | 17.5 | 22.5 | 26.8 | 35.2 | 45.5 |
Executive Standard
1. Design, manufacture, assembly, experiment and acceptance of boilers in strict accordance with national and industrial standards, including but not limited to the following standards: GB/T16508 Boiler Shell Boiler, TSG G0001 Boiler Safety Design Supervision Code, GB50273 Boiler Installation Engineering Construction and Acceptance Code
2. The main steel used in the boiler is 20 GB/T3087, which ensures the safety and reliability of the boiler.
3. Welding materials shall be selected according to NB/T47018. Full penetration welding with argon protection shall be performed on the boiler tube.
Steam Boiler Maintenance
- Boiler body and big size accessories are in shrink wrap package;
- Burner, controller and small size accessories are packed in wooden box or carton.
- 0.5-2t boiler loaded in 1x 20GP
- 2.5-5t boiler loaded in 1x 40HQ
- 6t and bigger boiler loaded in special container.