High Modulus Low Shrinkage Dipped Nylon Tyre Cord Fabric For Tire
Nylon 6 grey and dipped tire cord fabrics having high strength, fatigue resistance, impact resistance, high adhesion characteristics, are mainly used as reinforcements of tyres.
We can supply nylon tyre cord fabrics such as 840D/1,840D/2, 1260D/1 and 1260D/2 and 1260D/3, 1680D/1 and 1680D/2,1890D/2,etc.
Feature
high modulus
low shrinkage
high breaking tenacity
good creep-resistance
excellent dimensional stability
Specification
ITEM | 420D/2 | 840D/2 | 1260D/2 | 1260D/3 | 1680D/2 | 1890D/2 |
Breaking strength (N) | ≥68 | ≥137 | ≥215 | ≥310 | ≥280 | ≥310 |
Breaking elongation (%) | ≥14.0 | ≥14.0 | ≥14.0 | ≥14.0 | ≥14.0 | ≥14.0 |
EASL (%) | 8.5±0.6 | 8.5±0.5 | 8.5±0.6 | 9.0±0.6 | 8.5±0.6 | 9.0±0.6 |
Heat shrinkage (160℃, 2MIN)(%) | ≤5.0 | ≤5.0 | ≤5.0 | ≤5.5 | ≤5.0 | ≤5.0 |
H-adhesion (N/CM) | ≥53.0 | ≥108.0 | ≥137.0 | ≥156.0 | ≥156.0 | ≥156.0 |
Our Company
EPM (WUXI) NEW MATERIALS CO., LTD. mainly produces dipped polyester and nylon tire cord fabric, chafer, membrane, dipped conveyor belt fabric, escalator handrail fabric, dipped cords, twisted cords, and other industrial fabrics, widely used in tires, automotive air brake diaphragm, conveyor belt, escalator handrail belt, etc. Company is committed to develop special industrial fabrics for rubber reinforcement materials.
EPM has exported our goods to many countries and regions, such as Brazil, Italy, Russia, Turkey and south of Asia, if you have any questions or requirements, please feel free to make us know.
FAQ
1.Q: Are you factory or trading company?
A: We have professional factory located in Wuxi, China.
2.Q: What is your MOQ?
A: Our MOQ is different according to different products.
3.Q: Which products do you have?
A: We have dipped polyester and nylon tire cord fabric, chafer, membrane, dipped conveyor belt fabric, escalator handrail fabric, dipped cords, twisted cords, and other industrial fabrics.
4.Q: How to get a sample?
A: Sample can provide for free, with freight collect;
5.Q:How to place a order?
A:- Place order with sales;
-Sample making for confirmation before mass production;
-After sample confirmed, mass production;
-Once goods are finished, inform buyer to make payment;
-Delivery.